Laserfiche WebLink
I <br /> 1 3-04.AP3 <br /> 1 2 Section 3-04, Acceptance of Aggregate <br /> 3 April 6, 2015 <br /> 4 3-04.5 Payment <br /> 5 In Table 1, the "Maximum Sublot Size (Tons)" value for the item HMA Aggregate is revised <br /> ' 6 to read "2000". <br /> 7 <br /> 8 In Table 2, the row containing the item "HMA Aggregate" is revised to read: <br /> 9 <br /> 9-03.8(2) HMA Aggregate 15 15 Uncompact <br /> ed Void <br /> Content 15 <br /> I 10 <br /> 11 <br /> 12 5-01.AP5 <br /> 13 Section 5-01, Cement Concrete Pavement Rehabilitation <br /> 14 August 4, 2014 <br /> 15 5-01.2 Materials <br /> 16 The referenced section for the following item is revised to read: <br /> 17 <br /> 18 Dowel Bars 9-07.5 <br /> 19 <br /> 20 5-01.3(4) Replace Portland Cement Concrete Panel <br /> 21 In the third paragraph, the last sentence is deleted. <br /> 22 <br /> 23 The seventeenth paragraph (beginning with "The Contractor shall place a bond-breaking <br /> 24 material...") is deleted. <br /> 25 <br /> 26 5-02.AP5 <br /> ' 27 Section 5-02, Bituminous Surface Treatment <br /> 28 August 4, 2014 <br /> 29 5-02.3(11) Temporary Raised Pavement Markings <br /> 30 This section's title is revised to read: <br /> I 31 <br /> 32 Temporary Pavement Markings <br /> 33 <br /> 34 The word "raised" is deleted from this section. <br /> 35 <br /> 36 5-04.AP5 <br /> 37 Section 5-04, Hot Mix Asphalt <br /> 38 August 3, 2015 <br /> 39 5-04.2 Materials <br /> 40 The third through eighth paragraphs are deleted and replaced with the following: <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />