Laserfiche WebLink
1 <br /> 1 Details of the proprietary curing blanket system, including product literature and details <br /> 2 of how the system is to be installed and maintained, shall be submitted to the Engineer <br /> 3 for approval. I <br /> 4 <br /> 5 The wet curing regime as described shall remain in place for at least 14 consecutive <br /> 6 calendar days. <br /> 7 <br /> 8 6-02.3(12)A Construction Joints in New Construction <br /> 9 The third paragraph is deleted and replaced with the following three new paragraphs: <br /> 10 <br /> 11 If the Plans require a roughened surface on the joint, the Contractor shall strike it off to <br /> 12 leave grooves at right angles to the length of the member. Grooves shall be installed <br /> 13 using one of the following options: <br /> 14 <br /> 15 1. Grooves shall be 1/2 to 1 inch wide, %4 to 1/2 inch deep, and spaced equally at <br /> 16 twice the width of the groove. Grooves shall terminate approximately 1 1/2- <br /> 17 inches from the face of concrete. <br /> 18 <br /> 19 2. Grooves shall be 1 to 2 inches wide, a minimum of deep, and spaced a <br /> 20 maximum of three times the width of the groove. Grooves shall terminate <br /> 21 approximately 1 '/-inches from the face of concrete. <br /> 22 <br /> 23 If the Engineer approves, the Contractor may use an alternate method to produce a <br /> 24 roughened surface on the joint, provided that such an alternate method leaves a <br /> 25 roughened surface of at least a 1/4-inch amplitude. <br /> 26 <br /> 27 If the first strike-off does not produce the required roughness, the Contractor shall <br /> 28 repeat the process before the concrete reaches initial set. The final surface shall be <br /> 29 clean and without laitance or loose material. <br /> 30 <br /> 31 6-02.3(12)B Construction Joints Between Existing and New Construction <br /> 32 The phrase "by method(s) as approved by the Engineer" is deleted from each paragraph in <br /> 33 this section. <br /> 34 <br /> 35 6-02.3(13) Expansion Joints <br /> 36 The first sentence of the second paragraph is revised to read: <br /> 37 <br /> 38 Joints made of a vulcanized, elastomeric compound (with neoprene as the only <br /> 39 polymer) shall be installed with a lubricant adhesive as recommended by the <br /> 40 manufacturer. <br /> 41 <br /> 42 In the third paragraph, "injuring" is revised to read "damaging". <br /> 43 <br /> 44 The following two new subsections are added: <br /> 45 <br /> 46 6-02.3(13)A Strip Seal Expansion Joint System <br /> 47 The Contractor shall submit Working Drawings consisting of the strip seal expansion <br /> 48 joint shop drawings in accordance with Section 6-03.3(7). These plans shall include, at <br /> 49 a minimum, the following: <br /> 50 <br /> 51 1. Plan, elevation, and sections of the joint system and all components, with <br /> 52 dimensions and tolerances. <br /> 1 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />