My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> INSTRUCTIONS TO BIDDERS <br /> I <br /> 1.0 Design Engineer <br /> Questionsq Specifications and inquiries about these S ecifications and Contract Plans should be directed to the <br /> attention of Corey Hert, (425) 257-8887 or chert@everettwa.gov. <br /> 111 <br /> 2.0 Bidder's Check List <br /> The bidder's attention is directed to the following forms which must be executed in full as required <br /> and submitted with the bid: <br /> 1. Proposal: The lump sum and unit price items must be shown in the space provided. Show <br /> unit prices in figures. <br /> 2. Proposal Signature Sheet: To be filled in and signed by the Bidder. <br /> 3. Subcontractor List: To be filled in by the Bidder. <br /> 4. Local Agency Disadvantaged Business Enterprise Utilization Certification <br /> (DOT Form 272-056A): To be filled in and signed by the bidder(if DBE goal is assigned.) <br /> 5. Local Agency Disadvantaged Business Enterprise (DBE)Written Confirmation <br /> Document (DOT Form 422-031A): To be filled in and signed by DBEs (if DBE goal is <br /> assigned.) <br /> 6. Non-Collusion Affidavit: To be signed and submitted with the bid. <br /> 7. Bid Bond: This form is to be executed by the Bidder and the surety company unless bid is <br /> accompanied by a certified check. The amount of this bond shall be not less than five percent <br /> (5%) of the total amount bid and may be shown in dollars or on a percentage basis. Cash will <br /> not be accepted. <br /> 1 Failure to complete the aforementioned forms and to submit said forms with the bid may be due <br /> cause for rejection of bid. <br /> 3.0 Contract Forms <br /> The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful bidder in duplicate within twenty <br /> (20) calendar days after the award date. <br /> 2. Performance Bond (DOT Form 272-002A): This form is to be executed by the successful <br /> bidder and his surety company in triplicate. The amount of this bond shall be one hundred <br /> percent(100%) of the amount of the bid and shall be submitted with the contract. <br /> 3. Payment Bond (DOT Form 272-003A): This form is to be executed by the successful bidder <br /> and his surety company in triplicate. The amount of this bond shall be one hundred percent <br /> (100%) of the amount of the bid and shall be submitted with the contract. <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> FED AID#HSIP-000S(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.