My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 INTRO.AP1 <br /> 2 INTRODUCTION <br /> 3 The following Amendments and Special Provisions shall be used in conjunction with the <br /> 4 2014 Standard Specifications for Road, Bridge, and Municipal Construction. <br /> 5 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 7 <br /> 8 The following Amendments to the Standard Specifications are made a part of this contract <br /> 9 and supersede any conflicting provisions of the Standard Specifications. For informational <br /> 10 purposes, the date following each Amendment title indicates the implementation date of the <br /> 11 Amendment or the latest date of revision. <br /> 12 <br /> 13 Each Amendment contains all current revisions to the applicable section of the Standard <br /> 111 14 Specifications and may include references which do not apply to this particular project. <br /> 15 <br /> 16 1-01.AP1 <br /> 17 Section 1-01, Definitions and Terms <br /> 18 August 3, 2015 <br /> 19 1-01.3 Definitions <br /> 20 The definition for "Engineer" is revised to read: <br /> I 21 <br /> 22 The Contracting Agency's representative who directly supervises the engineering and <br /> 23 administration of a construction Contract. <br /> 24 <br /> 25 The definition for"Inspector" is revised to read: <br /> 26 <br /> 27 The Engineer's representative who inspects Contract performance in detail. <br /> 28 <br /> 29 The definition for"Project Engineer" is revised to read: <br /> 30 <br /> 31 Same as Engineer. <br /> 32 <br /> 33 The following new term and definition is inserted after the definition for"Proposal Form": <br /> 34 <br /> 35 Reference Information — Information provided to the Contractor by the Contracting <br /> 36 Agency that is not part of the Contract. <br /> 37 <br /> 38 The definition for "Working Drawings" is revised to read: <br /> 39 <br /> 40 Drawings, plans, diagrams, or any other supplementary data or calculations, including a <br /> 41 schedule of submittal dates for Working Drawings where specified, which the Contractor <br /> 42 must submit to the Engineer. <br /> 43 <br /> I <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.