Laserfiche WebLink
1 INTRO.AP1 <br /> 2 INTRODUCTION <br /> 3 The following Amendments and Special Provisions shall be used in conjunction with the <br /> 4 2014 Standard Specifications for Road, Bridge, and Municipal Construction. <br /> 5 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 7 <br /> 8 The following Amendments to the Standard Specifications are made a part of this contract <br /> 9 and supersede any conflicting provisions of the Standard Specifications. For informational <br /> 10 purposes, the date following each Amendment title indicates the implementation date of the <br /> 11 Amendment or the latest date of revision. <br /> 12 <br /> 13 Each Amendment contains all current revisions to the applicable section of the Standard <br /> 111 14 Specifications and may include references which do not apply to this particular project. <br /> 15 <br /> 16 1-01.AP1 <br /> 17 Section 1-01, Definitions and Terms <br /> 18 August 3, 2015 <br /> 19 1-01.3 Definitions <br /> 20 The definition for "Engineer" is revised to read: <br /> I 21 <br /> 22 The Contracting Agency's representative who directly supervises the engineering and <br /> 23 administration of a construction Contract. <br /> 24 <br /> 25 The definition for"Inspector" is revised to read: <br /> 26 <br /> 27 The Engineer's representative who inspects Contract performance in detail. <br /> 28 <br /> 29 The definition for"Project Engineer" is revised to read: <br /> 30 <br /> 31 Same as Engineer. <br /> 32 <br /> 33 The following new term and definition is inserted after the definition for"Proposal Form": <br /> 34 <br /> 35 Reference Information — Information provided to the Contractor by the Contracting <br /> 36 Agency that is not part of the Contract. <br /> 37 <br /> 38 The definition for "Working Drawings" is revised to read: <br /> 39 <br /> 40 Drawings, plans, diagrams, or any other supplementary data or calculations, including a <br /> 41 schedule of submittal dates for Working Drawings where specified, which the Contractor <br /> 42 must submit to the Engineer. <br /> 43 <br /> I <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />