Laserfiche WebLink
r <br /> 1 4. A minimum of 30 percent of complete penetration vertical welds on steel column <br /> ' 2 <br /> 3 jackets 5/6-inch or thinner, within 1.50 column jacket diameters of the top and <br /> bottom of each column, shall be magnetic particle inspected. The largest column <br /> 4 cross section diameter for tapered column jackets shall constitute one column jacket <br /> 5 diameter. <br /> 1 6 <br /> 7 The last paragraph is supplemented with the following new sentence: <br /> 8 <br /> I 9 If any rejectable flaws are found in any test length of item 4 above, 100 percent of the <br /> 10 weld within the specified limits shall be inspected. <br /> 11 <br /> 12 6-03.3(27) High Strength Bolt Holes <br /> 13 The last paragraph is revised to read: <br /> 14 <br /> 15 The Contractor shall submit Type 2 Working Drawings consisting of a detailed outline of <br /> 16 the procedures proposed to accomplish the work from initial drilling through shop <br /> 17 assembly. <br /> 18 <br /> 19 6-03.3(27)C Numerically Controlled Drilled Connections <br /> 20 In the second paragraph, the first sentence is revised to read: <br /> 21 <br /> 22 The Contractor shall submit Type 1 Working Drawings consisting of a detailed outline of <br /> 23 proposed N/C procedures. <br /> 24 <br /> 25 6-03.3(29) Welded Shear Connectors <br /> 26 This section's content is deleted and replaced with the following: <br /> 27 <br /> 28 Installation, production control, and inspection of welded shear connectors shall <br /> 29 conform to Chapter 7 of the AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code. If <br /> 30 welded shear connectors are installed in the shop, installation shall be completed prior <br /> 31 to applying the shop primer coat in accordance with Section 6-07.3(9)G. If welded shear <br /> 32 connectors are installed in the field, the steel surface to be welded shall be prepared to <br /> 33 SSPC-SP 11, power tool cleaning, just prior to welding. <br /> I 34 <br /> 35 6-03.3(33) Bolted Connections <br /> 36 In the second paragraph, the first sentence is revised to read: <br /> 37 <br /> 38 The Contractor shall submit Type 1 Working Drawings providing documentation of the <br /> 39 bolt tension calibrator, including brand, capacity, model, date of last calibration, and <br /> 40 manufacturer's instructions for use. <br /> 41 <br /> 42 In the second sentence of the second paragraph, the word "approved" is deleted. <br /> 43 <br /> 44 In item number 3 of the fifth paragraph, "approved" is revised to read "specified". <br /> 45 <br /> 46 In the center column header of table 1, "AASHTO M 164" is revised to read "ASTM A 325". <br /> 47 <br /> 48 In the column headings of table 3, "M 164" is revised to read "A 325". <br /> 49 <br /> 50 In the tenth paragraph, item number 3, "approved" is revised to read "accepted" in the <br /> 51 second and third sentences of the first paragraph. <br /> 52 <br /> r <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />