Laserfiche WebLink
Section 005213 <br /> Agreement Form <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this t t� y <br /> da of AC.7.001— <br /> fl117 , by and between the City of Everett, Washington, a municipal corporation existing <br /> under the laws of the State of Washington, hereinafter called the "City," and <br /> �R>`M It k -IELU DcV 109 mg-Wr } �I�L , a <br /> WA &1 *- (1POkt 14 N , hereinafter called the <br /> "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor, tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "Kasch Park Soccer Fields - <br /> Synthetic Turf Replacement Phase 2", (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorpo- <br /> rated by reference and are hereby made a part of this Contract: <br /> A. Notice to Bidders <br /> B. Instructions to Bidders <br /> C. General Conditions <br /> D. Supplementary Conditions (if any) <br /> E. Drawings, Standard Plans, and Specifications <br /> F. Addenda(if any) <br /> G. Payment and Performance Bond <br /> H. Contractor's Bid Form <br /> I. Other documents described as Contract Documents in Section 072000, General <br /> Conditions <br /> J. All provisions required by law whether set forth and reproduced herein or not <br /> Terms that are capitalized in a Contract Document but not defined in that Contract Document <br /> shall have the meaning defined to them in the other Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within Eighty <br /> (80) WORKING Days after the effective date of the Notice to Proceed. Physical Completion <br /> shall be within Fifteen (15) WORKING Days after the actual date of issuance of substantial <br /> completion. <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 <br /> 1 of 6 <br />