Laserfiche WebLink
Section 001113 <br /> Advertisement for Bids <br /> Sealed proposals for the Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 project will be <br /> received by the City of Everett,Washington, at the office of the City Clerk, 2930 Wetmore, Everett, WA <br /> 98201, until Tuesday, March 8,2016,at 2:00 p.m.. Bids will not be received thereafter.At the appointed <br /> time, all bids will be opened and read aloud in the 8th Floor Public Hearing Room, 2930 Wetmore, <br /> Everett WA. <br /> The character and scope of the work includes, but is not limited to: Removal and replacement of the <br /> synthetic turf at fields 2 and 3 including drainage improvements and placement of supplemental pad. <br /> Removal and replacement of the existing sportfield lighting and new controls at fields 1, 2 and 3. <br /> Removal of selected portions of existing fencing and furnish and install new fencing and netting at fields <br /> 1, 2 and 3. Install new inlaid markings at the existing synthetic turf at field 1. Access improvements <br /> including a new pedestrian access to fields 2 and 3 including designated handicap parking stalls. <br /> The engineer's estimate for this Project is$3,250,000.00. <br /> A pre-bid walk-through is scheduled at 11:00 AM,Wednesday, February 24,2016 at the site at 8811 <br /> Airport Road, Everett,WA.Any interested bidders may attend.Any questions and/or answers that may <br /> affect the bid will be included in an addendum to the bid documents and sent to all the planholders. <br /> Bid documents, addenda and other information regarding this project may be viewed on-line from <br /> Builders Exchange at http://www.bxwa.com/. Plan sets may also be purchase for reproduction costs at <br /> Bill's Blueprints (425) 259-0859 located at 2920 Rockefeller Avenue, Everett WA 98201. <br /> For technical questions regarding this project, contact Russell Dance, Project Manager, City of Everett <br /> Parks and Recreation Department, at 425-257-7335 or email at rdance@everettwa.gov. <br /> All proposals must be made on the regular forms provided for this purpose and must be accompanied by <br /> a Bid Bond or Certified Check in the amount not less than five (5) percent of the total amount(s) of the <br /> bid(s). A one hundred (100) percent Payment and Performance Bond will be required of the successful <br /> bidder to guarantee faithful performance of the contract. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. <br /> Except as otherwise provided in the Instructions to Bidders, no bidder may withdraw his bid after the <br /> hour set for the opening thereof.The City further reserves the right to make the bid award as deemed in <br /> the best interest of the City.The right is reserved by the City to postpone contract awards for a period of <br /> sixty(60) days after the bid opening. <br /> The Contractor will be required to comply with all Local, State, and Federal laws regarding equal <br /> employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 1 of 1 <br />