My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Premier Field Development, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:24:10 AM
Creation date
5/20/2016 11:54:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development, Inc.
Approval Date
5/9/2016
Council Approval Date
4/4/2016
Department
Parks
Department Project Manager
Russell Dance
Subject / Project Title
Kasch Park Soccer Fields Synthetic Turf Ph 2
Tracking Number
0000051
Total Compensation
$2,860,100.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development 12/27/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 12/28/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 5/30/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 001113 <br /> Advertisement for Bids <br /> Sealed proposals for the Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 project will be <br /> received by the City of Everett,Washington, at the office of the City Clerk, 2930 Wetmore, Everett, WA <br /> 98201, until Tuesday, March 8,2016,at 2:00 p.m.. Bids will not be received thereafter.At the appointed <br /> time, all bids will be opened and read aloud in the 8th Floor Public Hearing Room, 2930 Wetmore, <br /> Everett WA. <br /> The character and scope of the work includes, but is not limited to: Removal and replacement of the <br /> synthetic turf at fields 2 and 3 including drainage improvements and placement of supplemental pad. <br /> Removal and replacement of the existing sportfield lighting and new controls at fields 1, 2 and 3. <br /> Removal of selected portions of existing fencing and furnish and install new fencing and netting at fields <br /> 1, 2 and 3. Install new inlaid markings at the existing synthetic turf at field 1. Access improvements <br /> including a new pedestrian access to fields 2 and 3 including designated handicap parking stalls. <br /> The engineer's estimate for this Project is$3,250,000.00. <br /> A pre-bid walk-through is scheduled at 11:00 AM,Wednesday, February 24,2016 at the site at 8811 <br /> Airport Road, Everett,WA.Any interested bidders may attend.Any questions and/or answers that may <br /> affect the bid will be included in an addendum to the bid documents and sent to all the planholders. <br /> Bid documents, addenda and other information regarding this project may be viewed on-line from <br /> Builders Exchange at http://www.bxwa.com/. Plan sets may also be purchase for reproduction costs at <br /> Bill's Blueprints (425) 259-0859 located at 2920 Rockefeller Avenue, Everett WA 98201. <br /> For technical questions regarding this project, contact Russell Dance, Project Manager, City of Everett <br /> Parks and Recreation Department, at 425-257-7335 or email at rdance@everettwa.gov. <br /> All proposals must be made on the regular forms provided for this purpose and must be accompanied by <br /> a Bid Bond or Certified Check in the amount not less than five (5) percent of the total amount(s) of the <br /> bid(s). A one hundred (100) percent Payment and Performance Bond will be required of the successful <br /> bidder to guarantee faithful performance of the contract. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. <br /> Except as otherwise provided in the Instructions to Bidders, no bidder may withdraw his bid after the <br /> hour set for the opening thereof.The City further reserves the right to make the bid award as deemed in <br /> the best interest of the City.The right is reserved by the City to postpone contract awards for a period of <br /> sixty(60) days after the bid opening. <br /> The Contractor will be required to comply with all Local, State, and Federal laws regarding equal <br /> employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Kasch Park Soccer Fields-Synthetic Turf Replacement Phase 2 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.