My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Premier Field Development, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 10:24:10 AM
Creation date
5/20/2016 11:54:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development, Inc.
Approval Date
5/9/2016
Council Approval Date
4/4/2016
Department
Parks
Department Project Manager
Russell Dance
Subject / Project Title
Kasch Park Soccer Fields Synthetic Turf Ph 2
Tracking Number
0000051
Total Compensation
$2,860,100.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development 12/27/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 12/28/2016 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development 5/30/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D - 1 DEMOLITION NOTES <br /> = 1. THE CONTRACTOR SHALL CALL AND NOTIFY DIAL-A-DIG AT 8-1-1 A <br /> 0 <br /> _ 1__..___...- MINIMUM OF 2 WORKING DAYS BEFORE DEMOLITION, DIGGING OR 15. FIELD LOCATE EXISTING DRAIN LINES, FLAG AND PROTECT EACH UNE <br /> 41 GRADING OPERATIONS OCCUR. FROM CONSTRUCTION TRAFFIC. PIPE DAMAGED BY CONTRACTOR <br /> D SHALL BE REPAIRED AND REPLACED BY CONTRACTOR AT NO COST <br /> Z 2. CONTRACTOR SHALL REMOVE FENCING AS NECESSARY TO ACCESS TO THE OWNER. <br /> SITE. ALL FENCE ITEMS AND SURROUNDING FEATURES SHALL BE <br /> vo RESTORED OR REPAIRED TO ORIGINAL CONDITION AT END OF a REMOVE EXISTING CONCRETE CURB AND EDGE ANCHOR AND DISPOSE <br /> PROJECT. OF OFF SITE. BACKFILL VOID WITH PERMEABLE AGGREGATE. <br /> ig c-6- <br /> ti * y0. REMOVE ALL EXISTING SYNTHETIC TURF AND INFILL AND DISPOSE OF 17 REMOVE EXISTING BOLLARDS AND FOOTINGS AND DISPOSE OFF OF <br /> OFF SITE. THE CONTRACTOR IS ENCOURAGED TO MAKE EVERY SITE. BACKFILL VOID WITH APPROVED MATERIAL AND COMPACT TO <br /> ,II Sn <br /> = EFFORT TO RECYCLE THE VARIOUS COMPONENTS OF THE EXISTING 95%. <br /> 5' CD SYNTHETIC TURF SURFACING SYSTEM. EXISTING TURF IS A RUBBER <br /> T ow INFlLLED NOMINAL 2.5" POLYPROPYLENE /NYLON FIBER. 18. PROTECT EXISTING CATCH BASINS AND UTILITY BOXES. ADJUST RIMS <br /> 0 ' TO ACCOMMODATE SYNTHETIC TURF COVER. <br /> w0 REMOVE 2" DEPTH OF EXISTING CINDERS. <br /> ti- 19 PROTECT EXISTING PERIMETER CONCRETE CURB TO REMAIN. <br /> O 0 55.. REMOVE EXISTING CINDER SURFACING, PERMEABLE AGGREGATE, 20. SEE ELECTRICAL PLAN FOR DEMOLITION OF EXISTING LIGHTING <br /> AMENDED SAND TOP COURSE AND SAND BASE COURSE AND <br /> c) EXCAVATE TO A DEPTH NECESSARY TO ACCOMMODATE NEW SYSTEM. BACKFILL ALL VOIDS WITH APPROVED MATERIAL AND <br /> CONCRETE PAVING AND AGGREGATE BELOW. COMPACT TO 95%. <br /> F m <br /> o � 6. EXISTING STORM DRAIN PIPE LOCATIONS SHALL BE VERIFIED BY THE ® REMOVE EXISTING FENCE POSTS, FOOTINGS, FABRIC AND ALL <br /> CONTRACTOR IN THE FIELD PRIOR TO STORM CONSTRUCTION. ALL APPURTENANCES. FENCE IS SET IN LANDSCAPE BEHIND CONCRETE <br /> w CONFLICTS SHALL BE REPORTED TO THE ENGINEER FOR VERIFICATION CURB TO REMAIN. BACKFILL ALL VOIDS WITH APPROVED MATERIAL <br /> AND RESOLUTION. AND COMPACT TO 95%. <br /> 0 TRENCH TO EXISTING TOP OF LATERAL PIPE AND REMOVE EXISTING 22. CLEAR AND GRUB EXISTING NATURAL TURF TO ACCOMMODATE NEW <br /> FILL AND DISPOSE OF OFF SITE. BACKFILL WITH PEA GRAVEL FROM IMPROVEMENTS. RESTORE ALL AREAS TO EXISTING CONDITION OR <br /> cO TOP OF PIPE TO TOP OF EXISTING TOP COURSE PERMEABLE BETTER. <br /> AGGREGATE. <br /> n ®3 SAWCUT AND REMOVE EXISTING CONCRETE CURB, CURB CUT AND/OR <br /> m 8. PRESERVE AND PROTECT EXISTING IRRIGATION REMOTE CONTROL RAMP. <br /> 73 <br /> VALVES, IRRIGATION MAINLINE AND PERIMETER SPRINKLER. FIELD <br /> VERIFY. ®4 SAWCUT AND REMOVE EXISTING CONCRETE PAVING, BASE, GRASS <br /> D r m PAVERS, FENCING AND FOOTING AND DISPOSE OFF OF SITE. <br /> m O FIELD LOCATE AND REPLACE EXISTING QUICK COUPLING VALVE AND <br /> p H y H BOX. RELOCATE EXISTING QUICK COUPUNG VALVE IF NECESSARY. ©5 SAWCUT AND REMOVE EXISTING WALL. BACKFILL ALL VOIDS WITH <br /> m c cn n SEE DETAIL 2 ON SHEET F-2.3. PROTECT EXISTING UGHT POLES APPROVED MATERIAL AND COMPACT TO 95%. <br /> Z =N AND JUNCTION BOXES FROM DAMAGE DURING CONSTRUCTION. FIELD <br /> 1 m VERIFY LOCATION. CO CAREFULLY TRIM/ CUT EXMNG SYNTHETIC TURF AT UGHT POLE <br /> C mm > A BASE AND LAY BACK AS NEEDED TO ALLOW REMOVAL OF POLE. <br /> A 10 SEE ELECTRICAL PLAN FOR DEMOLITION OF EXISTING UGHTING CONTRACTOR SHALL REPAIR/ REPLACE TURF TO MATCH EXISTING <br /> 4t > > SYSTEM. BACKFILL ALL VOIDS WITH APPROVED MATERIAL AND CONDITIONS WITH GREEN ATTIC STOCK TURF CURRENTLY STORED ON <br /> m o COMPACT TO 95%. SITE. REMOVE EXISTING CONCRETE CURB AND EDGE ANCHOR <br /> -OUND EXISTING UGHT POLES TO BE REMOVED. CUTTURF AS _ <br /> m 11. REMOVE EXISTING TRASH RECEPTACLES AND DELIVER TO OWNER. NEEDED. BACKFILL ALL VOIDS WITH BASE AGGREGATE AND PREPARE <br /> Z FOR AREA FOR TURF PATCH. <br /> Cnn 12 REMOVE EXISTING PORTABLE BLEACHERS. <br /> v <br /> ti 13 REMOVE EXISTING "KWIKGOAL" SHELTER AND BENCHES AND DISPOSE <br /> OF OFF SITE. REMOVE EXISTING CONCRETE FOUNDATION IN CONFLICT <br /> WITH NEW CONSTRUCTION AND DISPOSE OF OFF SITE. <br /> ?I 14. PROVIDE TEMPORARY FENCING TO SECURE PERIMETER OF WORK <br /> CD m <br /> Iv m AREA. DO NOT INTERRUPT ACCESS/ SERVICE EXISTING FACILITIES TO <br /> REMAIN. FENCING SHALL MAINTAIN FIELD FOR PUBUC USE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.