My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3156-09
>
Ordinances
>
Ordinance 3156-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:07:55 AM
Creation date
11/3/2016 10:07:48 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3156-09
Date
11/25/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minimum Minimum Charge <br /> Cu.Ft. of Water Provided Water Minimum W/O Regard to <br /> Meter Size at Minimum Charge Charge Filtration Charge Consumption <br /> 1/2—3/4 inch 600 $13.98 $2.82 $16.80 <br /> 1 inch 1,000 $23.30 $4.70 $28.00 <br /> 2 inch 1,200 $27.96 $5.64 $33.60 <br /> Over 2 inch 1,600 $37.28 $7.52 $44.80 <br /> 5. Untreated Industrial Water: <br /> Monthly Water Charge (Kimberly Clark) $129,200.00 <br /> Other Industrial Users: <br /> Meter Charge $1,350.00 monthly <br /> Commodity Charge $304/MG <br /> 6. Fire Hydrants and standpipes: The general fund of the City shall pay for hydrant <br /> usage, including transmission and distribution mains, storage facilities and water <br /> used for fire suppression. Charge- $5,000 monthly. <br /> 7. a. City installed service connection charges: <br /> 5/8 x 3/4 inch $1,250.00 each <br /> 1 inch $1,725.00 <br /> 2 inch $2,650.00 <br /> b. New construction using an existing flat rate service and changing to a 5/8 <br /> x 3/4 Inch metered service shall be charged $784.00 <br /> c. Service connection installations larger than the two-inch size shall be <br /> charged at the actual cost of the complete installation <br /> d. Said charges include a $72 non-refundable application fee. Service <br /> connection applications shall be valid only for 180 days from date of issue <br /> unless work is in progress or a reasonable time extension is granted by the <br /> Utilities Superintendent. Service connection charges (less said non- <br /> refundable application fee) may be refunded to the applicant in the event <br /> that refund is requested within one year from the date of issue. <br /> e. Developer installed connection charges: <br /> 5/8 x 3/4 inch $450.00 each <br /> 1 inch $525.00 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.