My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3168-10
>
Ordinances
>
Ordinance 3168-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:36:36 AM
Creation date
11/3/2016 10:36:26 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3168-10
Date
1/27/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer may recommend that the City should assume responsibility for the further <br /> design, construction, operation and maintenance of the drainage facilities, or any increment <br /> of the responsibility of the facilities on the subject property. Should establishment of a <br /> regional detention facility at a location not contained in the subject property entail a greater <br /> public benefit, the City Engineer may require the developer to participate in the cost of such <br /> an off-site regional detention facility in lieu of constructing on-site detention facilities. Such <br /> decision shall be made concurrently with review and approval of the plan as specified in this <br /> ordinance. In the event that the City decides to assume responsibility for all or any portion <br /> of the design, construction, operation and maintenance of the facilities, the developer will be <br /> required to contribute a pro rata share to the construction cost of the facilities. The <br /> developer may be required to supply additional information at the request of the City <br /> Engineer to aid in the determination by the City. Guidelines for implementing this section <br /> will be defined in the procedures manual or by the City Engineer. <br /> is hereby amended to read as follows: <br /> In the event that public benefits would accrue due to modification of the drainage plan for <br /> the subject property to better implement the recommendations of an approved basin plan, the <br /> City Engineer may recommend that the City should assume responsibility for the further design, <br /> construction, operation and maintenance of the drainage facilities, or any increment of the <br /> responsibility of the facilities on the subject property. Should establishment of a regional <br /> detention facility at a location not contained in the subject property entail a greater public <br /> benefit, the City Engineer may require the developer to participate in the cost of such an off-site <br /> regional detention facility in lieu of constructing on-site detention facilities. Such decision shall <br /> be made concurrently with review and approval of the plan as specified in this ordinance. In the <br /> event that the City decides to assume responsibility for all or any portion of the design, <br /> construction, operation and maintenance of the facilities, the developer will be required to <br /> contribute a pro rata share to the construction cost of the facilities. The developer may be <br /> required to supply additional information at the request of the City Engineer to aid in the <br /> determination by the City. Guidelines for implementing this section will be defined in the City <br /> of Everett Stormwater Management manual or by the City Engineer. <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.