My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3168-10
>
Ordinances
>
Ordinance 3168-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 10:36:36 AM
Creation date
11/3/2016 10:36:26 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3168-10
Date
1/27/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is hereby amended to read as follows: <br /> The City may assume the operation and maintenance of retention/detention or other drainage <br /> treatment/abatement facilities after the expiration of the two (2) year operation and <br /> maintenance period in connection with the subdivision of land if: <br /> A. All of the requirements of Section 7 of this ordinance have been fully complied with; and <br /> B. The facilities have been inspected and accepted by the Utility Department after two (2) <br /> years of operation in accordance with the City of Everett Stormwater Management <br /> Manual; and <br /> C. All necessary easements entitling the City to properly maintain the facility have been <br /> conveyed to the City and recorded with the Snohomish County Auditor; and <br /> D. The warranty bond required in Section 7(d) of this ordinance has been extended for one <br /> year, covering the City's first year of operation and maintenance; and <br /> E. The developer has supplied to the City an accounting of capital, construction, and <br /> operation and maintenance expenses or other items, for the drainage facilities up to the <br /> end of the two year period. <br /> In the event that the City elects not to assume the operation and maintenance <br /> responsibility for the facilities, it will be the responsibility of the developer to make <br /> arrangements with the occupants or owners of the subject property for assumption of <br /> maintenance in a manner subject to the approval of the City Engineer or in accordance <br /> with the City of Everett Stormwater Management Manual. Such arrangements shall be <br /> completed and approved prior to the end of the two year period of developer <br /> responsibility. <br /> If the City elects not to assume operation and maintenance responsibility, the drainage <br /> facilities shall be operated and maintained in accordance with the arrangements as <br /> approved by the City Engineer. The City may inspect the facilities in order to ensure <br /> continued use of the facilities for the purposes for which they were built and in <br /> accordance with these arrangements. <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.