My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3185-10
>
Ordinances
>
Ordinance 3185-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 11:09:31 AM
Creation date
11/3/2016 11:09:28 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3185-10
Date
6/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. All other review processes listed in the zoning code as Review Process II; <br /> 38. All Review Process I and project permit applications that are not categorically <br /> exempt under SEPA; <br /> 39. Alternative best available science decisions as provided by Section 19.37.050(E); <br /> 40. Accessory buildings over two hundred square feet which have metal siding or <br /> corrugated roofing as provided by Section 19.07.020(K); <br /> 41. Accessory buildings which exceed one thousand square feet in area as provided by <br /> Section 19.07.020(M); <br /> 42. Accessory buildings which exceed fifteen feet in height as provided by Section <br /> 19.07.020(J); <br /> 43. Rockeries and retaining walls retaining soil (fill) four feet or greater in height in <br /> required building setback areas, as provided by Section 19.39.150(C)(5)(d). <br /> 44. Use of basement or other building spaces for uses not specifically listed as permitted <br /> use in the B-3 as provided by Section 19.22.030. <br /> * SEPA threshold determinations frequently include mitigation requirements as <br /> provided for in the SEPA ordinance (Chapter 20.04). Any SEPA condition based on <br /> SEPA substantive authority as provided for in the SEPA ordinance (Chapter 20.04) shall <br /> be identified in the land use permit decision, as provided in this integrated local project <br /> review process. <br /> ** An open public hearing may be required under the following circumstances, in <br /> which case the application shall be processed under Review Process III: (i) a public <br /> hearing is required by Title 18; (ii) any affected person files a written request for a <br /> hearing with the planning department within twenty-one days of the notice of application <br /> (public comment period); or (iii) either prior to or within the public comment period, the <br /> director or the city engineer and/or their designees require an open public hearing <br /> Section 2: Subsection 2(B) of Chapter 6 of Ordinance No. 2530-01, as amended(EMC <br /> 15.24.080), which reads as follows: <br /> 15.24.080 Review Process II—Administrative decisions. <br /> Public notice shall include notice of application and notice of decision. Public notice of <br /> the notice of application shall be provided by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.