Laserfiche WebLink
4. a. Irrigation metered rates -water charge: <br /> First 600 cu. ft., 0-600 cu. ft. $10.66 <br /> Next 2,400 cu. ft., 600-3,000 cu. ft. 1.777 per 100 cu. ft. <br /> Next 12,000 cu. ft., 3,000-15,000 cu. ft. .963 per 100 cu. ft. <br /> Over 15,000 cu. ft. .820 per 100 cu. ft. <br /> b. In addition, there shall be added a filtration charge of$0.325 per 100 cu. <br /> ft., $1.95 per month minimum. <br /> c. The following minimum monthly charge shall apply to all services to <br /> which water is available without regard to actual consumption: <br /> Cu. Ft. of Water Minimum Charge <br /> Provided at Minimum Minimum W/O Regard to <br /> Meter Size Minimum Charge Water Charge Filtration Charge Consumption <br /> 1/2-3/4 inch 600 $10.66 $1.95 $12.61 <br /> 1 inch 1,000 17.77 3.25 21.02 <br /> 2 inch 1,200 21.32 3.90 25.22 <br /> over 2 inch 1,600 28.43 5.20 33.63 <br /> 5. Untreated Industrial Water: <br /> Monthly Water Charge (Kimberly-Clark) $108,500.00 <br /> Other Industrial Supplies: <br /> Meter Charge $1,000.00 monthly <br /> Commodity Charge $255/MG <br /> 6. Fire hydrants and standpipes: The general fund of the City shall pay for hydrant <br /> usage, including transmission and distribution mains, storage facilities and water <br /> used for fire suppression. Charge - $5,000 monthly. <br /> 7. a. City installed service connection charges: <br /> 5/8 x 3/4 inch $1,050.00 each <br /> 1 inch 1,450.00 <br /> 2 inch 2,250.00 <br /> b. Service connection installations larger than the two-inch size shall be <br /> charged at the actual cost of the complete installation. <br /> c. Said charges include a $60 non-refundable application fee. Service <br /> connection applications shall be valid only for 180 days from date of issue <br /> unless work is in progress or a reasonable time extension is granted by the <br /> 8 <br />