My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
145 ALVERSON BLVD 2018-04-25
>
Address Records
>
ALVERSON BLVD
>
145
>
145 ALVERSON BLVD 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:41:19 AM
Creation date
11/7/2016 7:58:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ALVERSON BLVD
Street Number
145
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 SITE INSPECTIONS AND MONITORING <br />Monitoring includes visual inspection and documentation of the inspection and monitoring <br />findings in a site log book. A site log book will be maintained for all onsite construction <br />activities and will include: <br />A record of the implementation of the TESC Plan and SWPPP and other permit <br />requirements; and <br />• Site inspections; and <br />• Storm water quality monitoring. <br />For convenience, the inspection form and water quality monitoring forms included in this TESC <br />Plan and SWPPP include the required information for the site log book. This TESC Plan and <br />SWPPP may function as the site log book if desired, or the forms may be separated and <br />included in a separate site log book. However, if separated, the site log book but must be <br />maintained onsite or within reasonable access to the site and be made available upon request <br />to DOE or the local jurisdiction. <br />6.1 Site Inspections <br />All BMPs will be inspected, maintained, and repaired as needed to assure continued <br />performance of their intended function. The inspector will be a CESCL per BMP C160. The <br />name and contact information for the CESCL is provided in Table 5.1 of this TESC Plan and <br />SWPPP. <br />Site inspection will occur in all areas disturbed by construction activities and at all storm water <br />discharge points. Storm water will be examined for the presence of suspended sediment, <br />turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br />effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of <br />the BMPs to improve the quality of storm water discharges. All maintenance and repairs will be <br />documented in the site log book or forms provided with this document. All new BMPs or <br />design changes wilf be documented in the TESC Plan and SWPPP as soon as possible. <br />TESC Plan and SWPPP 2 June 2015 <br />American Legion Memorial Park Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.