Laserfiche WebLink
• <br />�- , �, <br />, <br />os / <br />/ <br />� c <br />o� / � � <br />/ <br />� ,� <br />o� , � � <br />/ � <br />a /� / ��n '/ <br />a� , <br />/ r � � / <br />/ j i <br />S / <br />0 <br />/ / / � <br />oS / / � <br />� <br />l � / <br />/ �o J <br />o� % ' <br />1- / <br />� <br />/� � / <br />� <br />3 � <br />/ � � a <br />� •' <br />" 7 // � o� <br />_ i / <br />—O I <br />% i � <br />�y o <br />/ � / <br />� � <br />i � � o �� <br />, , � <br />� / i <br />� <br />/ / � <br />� / <br />r � / <br />/ / / <br />11 / p � <br />/ / a <br />.i3 / O� <br />12 � / / � <br />/ � <br />�/ / <br />/ <br />� � � c Q <br />� <br />/ � �� <br />24"x35" SCALE 3/4" = 1'-G" � � <br />11"z17" SCALE: 3/8" = 1'-0" 1' 6' 0" 1' <br />�CI lL\IAT1C GROU�I�ING I'LAN <br />TrIE I\=0R!�'^-TIO\' CONTFlI�\'EG IN THI; C_T OF COVSTRUCTION �OCUMENi`; IS PROPFIETARY BY NPTURE. F,�Y U5= C� �SC_O�URE O7HEF2 THqN 7HAT WHICH RELATES TO CnF'FIEF �ERVCES I� ,r,TF:'��TLY P=G'-'12�TEC. <br />� <br />� <br />� <br />� <br />TRUE NORTH <br />,�.. .,, r 0� co,����,)ey <br />o-scR pTioN <br />GROUNDING KEYED NOTES: <br />O� ANTENNA GROUND BUS BAR AT TOP CF POLE Y/l'H COFk. <br />GROUND KIT. SEE DEfAIL 9/E-2 FOR GROUND BAR <br />CONSTRUCTION, SEE DETAIL 7/E-2 FOR GROUND WIRE <br />CONNECTIONS, AND SEE OEfAIL 6/E-2 FOR COAX GROUNDING. <br />MOfJOPOLE GROUND BUS BAR AT 3FSE CF FOLE. SEE DEfAIL <br />O 9/E-2 FOR GROUND QAR CONSTRUCTION, SE: DEfAIL 7/E-2 <br />FOR GROUND WIRE CONNECTIONS, AND SEE �ETAIL 6/E-2 FOR <br />CON( GROUNDING. <br />O3 �2 AWG POLE GROUND RING. SEE DEfAIL �/E-2 FCR BONDING, <br />SEE DETAIL 10/E-2 FOR TRENCHING. <br />O4 CAD WELD (NP). SEE DETAIL 2/E- 2. <br />OS TEST NIELL SEE D-AIL 3/E-2. <br />O6 GROUND ROD � 10'-0" O.C. MIN. (TYP) SEE DEfAIL 1/E-2. <br />O��6 AWG ANTENNA MOUNT GROUND TO ANT=NN4 GROUND BUS <br />�AR (N' OF 7) SEE DETAIL 5/E-2. <br />$O GROUND FROM ANTENNA GROUN� BJS BAR TO PO_E GROUND <br />BUS BAR (NP OF (2) PLACES). SEE DEfAIL 7/E-2. <br />O9/{6 AWG RRH UNR GROUND TO TIE INTO ExISTM� GROUND <br />SYSTEM (iYP OF 6). <br />�� SYSTEM (iYPE0FR6) ROUND TO TIE INTO EXISTWG GROUM1D <br />OEQLIPhIENT G30UN� BUS BAR AT CONCRETE PAD. 5=E G74iL <br />�� 9/E-Z FOR GROUND B4�R CONSTRUC-ON, SEE LETP.I� 7/�-2 <br />FOR GROUND WIRE CONNECTIONS <br />12 �6 AWG GROUND FROM LTE PURCELL CABINEf TO GROUND BA4. <br />13 j�6 AWG GROUND FROM POWER/BATTERY CA3ME� '0 GROUND <br />BAR. <br />14 �2 AWG GROUND FROM TOWER GROUND BUS BAR i0 TOWER <br />GROUND RING (NP OF 2 PLACES). SEE D�TFI_5 9/E-2, 7/c-2, <br />6/E-2, & 8/E-2. <br />15 �6 AWG GFOUND FROM UMTS CABME7 TO GRDUN� BAR. <br />GROUNDING NOTES & LEGEND <br />GENERAL GROUNDING NOTES <br />1. FLL CETAILS ARE SHOYl� I\' GENERFL TE4M5. PCTUti� IN� h�LSTON <br />AND CONSTRUCTION MAY V4RY DUE TO S'�iE SFECIP�C CGN��ITICNS. <br />2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS, Ak� OTHER <br />METALLIC COMPONENTS USING GROUND WIRES AND CONNECT TO <br />SURFACE NOUNTED BUS BARS. FOLLON! AVTENNA AND BTS <br />NANUFACTURERS PRACTICES FOR GROUNDING REQUIRE'dEV-S GROUNJ <br />COAX SHIELD AT BOTH ENDS AND EXIT FROM TOWER OR FOLE CSING <br />MFR'S PRACTICES. <br />3. ALL GROl1ND CONNECTIONS SHALL BE C.�DWELD. ALL WIRES SHALL BE <br />COPPER T,-.HN/THNIN. ALL GROUND WIRE SHA_L BE G<EEN INSULP,TEC <br />WIRE AEDVE GROUND. <br />4. CONTRACTOR TO VERIFY AND TEST GROl1ND TO SOURCE. GROUNDWG <br />AND OTHER OPERATIONAL 7ESTING WILL BE WITN=SSED BY AT&T <br />VVIRELESS, LLC. REPRESENTATIVE. <br />5. REFER TO DIVISION 16 GENERAL ELECTRIC; GENERAL ELECTRICAL <br />PROVISION AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING <br />STFNDARDS. <br />6. ELECTRI�AL CONTRACTOR TD PRO`JICE DE7AILED DESIGN OF <br />GRCUNDING SYSTEM, AND RECENE APPROVAL OF CESIGN BY <br />AUTHOftIZED AT&T MOBIUiY REPRESENTATIVE, PRIOR TO INSTAL.ATICN <br />OF GROUNDING SYSTEM. PHOTO DOCUMENT ALL CADWELDS AND <br />GRCUND RI,�G <br />7.NOTIFY CONSi�RUCTION MANAGER IF THERE ARE AVY CIF�ICULTIES <br />MSTALLING GROUNDING SYSTEM DUE 70 SITE SOIL CONDITIONS. <br />GROUNDING ROD NOTES <br />ELECTRICAL CONTRACTOR SH�LL ORDER GROUND RESISTA�CE TES.ING <br />COPPER GROUND ROD � TEST WELL ONCE THE GROUND SYSTEM HAS BEEN INSTALLED; A QUALIFIED <br />WD'�.VIDUAL, UTILIZING THE FALL OF POTENTIAL MEfHOD, SHOUL] <br />FERFORN THE TEST. THE REPORT WIL� SHO`N THE LOCATIC� OF T:^�_ <br />CADWELD CONNE"TION � GRCUND 6AR TEST ANC CONTAIN NO LESS THAN 9 TEST PCINTS ALONG TH� TESTING <br />V LWE GRPPHED DUT TO SHOW ThIE PLATCAU. <br />SIDE 5°LICE CADWELD 2 POINT GROUND TEST OR 3 POINT 629 TESTS WILL NOT BE <br />ACCEPTE7 AS ALTERNATIVES TD THE AFORE 61ENTIONED GROUND TESTS. <br />TEST SHALL BE FERFGRMED Y�HILE TNE COUNTER?OISE IS ISOLATE� <br />FIELD VERIFY & Tlc M'0 EXiSTING GROl1NDING SYSTEM FROM THE A/C SYSTEM GRIDS AND EXISTING COMN,UN CA-IONS FACILIiY <br />at&t <br />YOUf WOf�d. <br />/// 71/ <br />WEsTowFR- <br />C O M M U N/ C As.���x�rt�waa <br />�—r� <br />PACIfIG iE�ECOM SERVICES. LLC <br />4072 REGISTERED <br />� ARCHIT,�GT, <br />ST4TE OF NIASHINGTON <br />� EX�.G2-1&15 � <br />� <br />w <br />> <br />� <br />r r l 0 <br />�-�-I N <br />� <br />� <br />� <br />w <br />_ <br />Q w <br />Y W <br />� � <br />� ^ N <br />(i� o � <br />N a, <br />� o Q <br />� N� <br />� � <br />w � ~u <br />z� <br />Ww <br />� U u <br />Q <br />� <br />� ¢ <br />w <br />~� O <br />� � <br />J <br />� <br />SHEET TITLE <br />SCHEMATIC GROUNDING PLAN <br />SHEET NUMBER <br />E-1 <br />