Laserfiche WebLink
C� <br />• <br />����� �, <br />�a� � �, , <br />s <br />Components in this section are classified for Integrated Grounding (UL 2703). Follow these installation procedures to <br />ensure compliance with the following standards: <br />O INTEGRATED GROUNDING PER UL 2703 <br />;� STRUCTURAL CODE PER ASCE 7-10 <br />�CLASS A FIRE RAT�D PER UL 1703 WITH TYPE 1, 2, � 3 SOLAR MODULES <br />� a(FLUSH MOUNT, ANY ROOF SLOPE, ANY MODULE TO ROOF GAP, NO PERIMETER GUARDING REQUIRED) <br />ROOF ATTACHMENTS <br />Install base attachments. Mount Slotted L-Feet on <br />FlashFoot or compatible third-party roof attachments. <br />► IronRidge's all-in-one FlashFoot roof attachment is for pitched, <br />composition shingle roofs. Refer to Paae 6 or provided manual. <br />► Compatible third-party roof attachments: <br />• S-5! Standing Seam Matal Roof Clamps <br />• EcoFasten Green Fasten GF-t Anchors <br />• QuickMount PV Flush Mounts, Tilt Standoffs, and Tile Hook <br />► Refer to Paqes 7-8 for installing Standoffs or Tilt Legs. <br />A. CONNECT SPLICES <br />Insert Internal Splice 6" into first rail and secure with star <br />washer, Grounding Strap, and screw. Slide second rail <br />over Internal Splice and secure. Ensure screws are fully <br />seated. Repeat for all splices, but with star washers and <br />Grounding Straps only on one rail per row of modules. <br />► Rows exceeding 100 feet of rail must use Expansion Joints. <br />► For XR10 and XR100 rails, insert screws along the provided lines. <br />► Don't use rail splices in middle 1/3 of interior spans or end spans. <br />Q Screws can be inserted on front or back of rails. <br />B. ATTACH RAILS <br />Slide 3/8"-16 hardware into side-facing rail slot. Space <br />bolts to match attachment spacing. Drop rail with hardware <br />into Slotted L-Feet. Level rail at desired height, then torque <br />to 204 in-Ibs. <br />► If using Mid Clamps with hex bolts, slide bolts into top rail slot. <br />Q Rail and L-Feet can face either upslope or downslope on roof. <br />�.� ..._._..._.,.. .._......__ _._. ........_..__ _ , �..�,., .� �........ _ . . ............�..., <br />, <br />A <br />� <br />� � � � <br />� <br />i <br />� � � I <br />� <br />� <br />� i <br />€ <br />i <br />Ai---- _... _ _..____. <br />� _ —.� Splice 6" 1 �de Rail <br />Fully Seat <br />Screws <br />��� � � <br />;��,- <br />_ `` _.... �,...��_..�_�_...��_���_ �...� <br />��: . ��..._ � ... <br />�` � ��� '�-��,, <br />� ���� '�� �\ <br />��\\� Grounding Straps Only �� � � ��,�, � <br />�;��,� \�� Needed on One Rail \� � ��� ' <br />� '�.�\ ; ����,`\ per Row of Modules � <br />�v� .`�. �� <br />i � � <br />�� \` � ; <br />� � � <br />� m ���� � �������w�� me�� e�e � <br />,��, / ,\ <br />��J�/ � <br />Torque to <br />204 in-Ibs <br />, <br />�''�� <3 .. m��`��'i��,�e _ , , w .� � .A .���, ; . ; . � � ^ . �, ._.. : ,.: , ;�. fE:�Ra . <br />�a4E�r'n�is . . . ,. . �. � . . . . s6fke''xd+,�a�t ���%P1ekn;i���. ��� <br />