Laserfiche WebLink
Geotec'nnical �ngineering Evaluation <br />Packer Property <br />Retainir�g ��Jalls and Steep Slope Evaluation <br />Everett, VJashington <br />NGA File No. 8"]Ol 13 <br />Maro1� 11, 2013 <br />Page 14 <br />{Symphoricarpos albus), Nootka rose (Rosa nutkana), Ocean Spray (I-�c�lodiscus discolor), and Oregon- <br />grape (.Tvianhonia nervosa}. �T�'e should be retained to review and camment on the slope vegetatian plan. <br />The homeawners should be able to come up with the re-rregetation plan, but NGA should be retained to <br />review such plan prior to implementation. The actuaI need/extent of the erosion control matting shauld <br />be evaluated by NGA after tlie ��all is iflstalled. <br />�aili�ag VF'ail Repairs <br />The sectioza of the eaisting wall that has failed but not related to t17e s1�pe failure should be repaired by <br />placing the bloeks on a concrete leveling pad and backfiliing the wall v��ith clean crushed rock. Some of <br />the slumpine sails in this area should be additionaily over-exca�-ated and replaced with the czushed rock <br />backfill. These repairs should be completed prior tn insta�ling t31e reiaining u�all in ihe slide area. NGA <br />should approve tne repairs dunng construction. <br />tiSE OF'FI�IS �2EPOR'�' <br />NGA 11as prepared this repart for Robert and Heidi Packer and their agents for use in the plai�ning and <br />budgeting of the repairs on this site only. The scope of our work does not include services related to <br />construction safety precautions and our recommendations are not intended to direci i:l�e contractors' <br />methods, techniques, sequences, or procedures, except as specifically described in our report for <br />consicieration in design. There are possrble variations in subsurface conditions between the explorations <br />and also with time. Our report, concIusions, and interpretations should not be construed as a warranty of <br />subsurface conditions. A contingency for unanticipated conditions should be included in the budget and <br />schedule. <br />All people ��ho outn or occupy homes an hillsides sho�ld realize ihat landslide movements are al��ays a <br />possibilit}�. The landowner should periadicalIy inspect the slape, especially after a winter starm. If <br />distress is evident, a geotecl�nical engineer should be contactea for advice on remediaUpreventative <br />measures. The probability that landsliding �rill occur is substantially reduced bv the proper maii�tenance <br />of ciraina�e cantrol measures at the site. Therefore, ihe homec�vsmer should take responsihility for <br />performing such maintenance. Consequentl_y, u�e recommend t11at a copy of our report be pravided to any <br />future homeawners of the property if the hame is sold. <br />/NELSOiV GEOiECHNfCAL ASSOCI�T�S, fit�'C. <br />