Laserfiche WebLink
�� ��� �� �� ��� �� <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Dafie: 11/19/2013 <br />�'ublic Works t'ermit �'r-: l�W1311-010 <br />Building Permit #; <br />Planning Reference �: <br />Public Works Fee $: $ 85.00 <br />Other $: <br />OWNER NAME ARlD ADDRE�S: APPLICANi N/aME ANDlaDDRES�: <br />BILL HODO SAME AS OWNER <br />307 PROSPECT AVC <br />MUKILTEO Wq 98275 <br />PHOfVE: 4254238141 PHONE: <br />iAX PARC�L ID � �ITE ADDRESS: 4925 OCEAN AVE <br />DESCRIPiION OF PROPOSED WORK: <br />CLEARING AND GRADING <br />(11/19/2013 11:01 AM BES) <br />REMOVE ABOUT 30 TREES AND STUM!'S AND FlLL THE STUMPS <br />PERMIT CONDITIONS <br />1. All calis for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Sfiandards <br />and Specificafions. <br />_._. .. -- _-- - - - <br />3. Call Location Underground Service 48 hrs before you dig. TOLL �REfE NUd�fI�ER �'i1 <br />4. Install erosion control measures as determined by the Public Works Inspector, such as silt fence, straw balesir; 4�;� �_; <br />.. , ,.� , <br />swales, or erosion blankets. �--�� �' i�� <br />�-' w <br />5. Remove erosion control measures upon complefiion of the project prior to final approval of the per��r.:� ,;^; _ ° <br />6. No dirt, mud, rocks or debris to be tracked onto roadway. �; ?=y ��' H <br />7. Contact the City Inspector Randy Allen 425-339-7403 prior �`' �� ` ~ <br />�.,, � <br />� : :� �---� <br />to starfing construction. ��� <br />;_<< -�� ,_ <br />_. �= ,_- <br />d for <br />� � �7 <br />Date <br />�c c�► �Z -� -�3. <br />L INSPEC ON�"r Date ✓ <br />roved as Constructed <br />�;f <br />i ��I <br />•EI?h � �FSt <br />r_r�1 �_ra <br />I�Tj ,t°'S v l'j <br />r`�� 'r� � ] <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />—� �`_ _ _ <br />� <br />Signature of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />