My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3250-11
>
Ordinances
>
Ordinance 3250-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2016 10:20:21 AM
Creation date
11/8/2016 10:20:20 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3250-11
Date
12/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ORDINANCE NO. 3250-11 <br /> AN ORDINANCE creating a special improvement project entitled, <br /> "Evergreen Way(SR99) -Airport Road to 112th Street Pedestrian <br /> Safety," Fund 303, Program 092, to accumulate all costs for the <br /> improvement. <br /> WHEREAS,the City of Everett is committed to a planned traffic and safety improvement <br /> program; and <br /> WHEREAS,the City of Everett has identified the need and received funds for design and <br /> construction of pedestrian safety improvements on Evergreen Way, between Airport Road and <br /> 112th Street; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 092, entitled <br /> "Evergreen Way(SR99) - Airport Road to 112th Street Pedestrian Safety,"to accumulate all <br /> costs for the improvement. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 092, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director," under direction of the Mayor, <br /> to assume full and complete responsibility for conducting all tasks and doing all things to <br /> accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$390,000.00 is hereby appropriated to Fund 303, Program 092, "Evergreen Way <br /> (SR99) - Airport Road to 112th Street Pedestrian Safety," as follows: <br /> A. Estimated Project Costs <br /> Design $50,000.00 <br /> Construction $ 340,000.00 <br /> Total Estimated Cost $ 390,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.