Laserfiche WebLink
C. The Public Works Director may require alternate size and placement of banners, if, in <br /> the Public Works Director's sole discretion,the proposed locations cannot accommodate the <br /> requested size or mounting heights. <br /> D. Issuance of a City permit does not absolve the applicant of the need to gain <br /> authorization from the owners of any non-City owned street lights, telephone/utility poles, <br /> private bridges, or skywalks. <br /> Section 11. Removal Bond Required Prior to Installation <br /> No banner shall be installed pursuant to a permit until Public Works has on file a surety bond <br /> or cash deposit so conditioned as to assure that the City shall be reimbursed for any expense <br /> that may be incurred by the City in repairing or removing any banner or installation device <br /> installed pursuant to the applicant's permit, in repairing damage to City owned equipment <br /> resulting from the banner installation, or in otherwise enforcing any order,rule, or policy of <br /> Public Works. Upon the face of each application received, Public Works shall indicate the <br /> minimum amount of bond or cash deposit required for the requested permit, which shall be at <br /> the reasonable discretion of Public Works and shall be acknowledged by the applicant. The <br /> amount of the bond or cash deposit shall not be less than the amount so indicated. The <br /> applicant must provide Public Works evidence of the removal bond or provide the cash <br /> deposit ten (10) days prior to installation of any banner. The unused portion of any cash or <br /> other deposit shall be returned to the applicant within thirty (30) days of permit expiration or <br /> revocation. <br /> Section 12. Installation Location and Method <br /> A. Regardless of permit authority, banners shall not be installed on poles with vehicular <br /> or pedestrian signal equipment. <br /> B. The applicant may hire a private contractor to install its banners in locations as <br /> approved by the City. The applicant may pay the City, subject to the approval of the Public <br /> Works Director,to install its banners. If the City performs the installation,the applicant shall <br /> reimburse the City for all costs incurred including overtime pay and employee benefits. <br /> C. Installation of banners must conform to all City standards established by the Public <br /> Works Director. The Public Works Director is authorized to specifically allow deviations <br /> from the standards by identifying the deviations in the permit. <br /> D. Installation of banners on, or removal from, City owned poles may only be carried out <br /> by those installers approved by the Public Works Director. <br /> Section 13. Maintenance <br /> The applicant has the sole responsibility to maintain any banners or installation devices <br /> placed by the applicant in or spanning the Public Rights-of-Way. The applicant must <br /> faithfully repair and replace all property damaged by its banners or the installation of its <br /> Page 5 of 8 <br />