My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3268-12
>
Ordinances
>
Ordinance 3268-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2016 11:34:49 AM
Creation date
11/8/2016 11:34:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3268-12
Date
4/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evergreen Way Revitalization Plan <br /> must be noted that added annual maintenance costs borne by the City will increase in order <br /> to properly maintain median landscaping in a healthy and attractive condition. This plan <br /> does not identify additional funds necessary for increased maintenance obligations. As with <br /> any capital project the City undertakes, it must also consider the ongoing costs of <br /> maintenance, particularly in a challenging work environment (lane closure, flaggers, etc.) <br /> like Evergreen Way where traffic volumes are significant and worker safety is the primary <br /> concern. <br /> "Median Landscape," to enhance the aesthetics of the corridor. <br /> EXISTING <br /> 1 1 1 <br /> .�. til 1M .min. <br /> „,2 Sidewalk/ Thru GP lane Thru GP lane Thru GP lane/Center'Zrn lane Thru'P lane 1,Thru GP lane 1 Thru G3 lane /S'Mewe142 6 <br /> 13' 11' <br /> 02' <br /> / f <br /> 100' <br /> PROPOSED <br /> Center Turn Lane <br /> rp, <br /> Fl . k 4� [z <br /> . Ir� <br /> r fha � �. I <br /> Sidewalk lPln1g f Thru GP lane Thru GP lane Thru GP lane Center tum lane 1,Thru GP lane I Thru GP lane 1, That GP lane 7Intgg I,Sidewalk <br /> 6' 7 4' 13' 12' 11' 11' 13' 4'1 IY <br /> / f <br /> 82' <br /> / f <br /> 105' <br /> PROPOSED <br /> Median Landscape <br /> ("), <br /> r" r� <br /> - \rLd 7 <br /> Iii `"� .t• 1I -.,i*V" 'w�Na �� . I:: <br /> /Side alk I 4 tg/ Thai;P lane 1 Thnr GP lane I,Thnr'P lane,Median/Nm lane Thru'P lane 4,Thru GP lane. Thru G31:lane /4 gi,Sid6 alk/ <br /> f f <br /> 62' <br /> 1D6' <br /> Figure 11 <br /> The following graphic (Figure 12) identifies redevelopment strategies and some <br /> conceptual capital improvements within and near the Evergreen Way corridor. Capital <br /> improvement projects that support the land use strategies of this plan may extend to <br /> areas far beyond the areas proposed for rezoning. More detailed review of potential <br /> capital improvements, design, costs, benefits and priorities may result in the decision to <br /> not build some of the improvements identified in this plan. Other improvements not <br /> listed in this plan may also be identified in the future as priority projects to enhance <br /> access between the Evergreen Way corridor and surrounding neighborhoods. <br /> Page <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.