Laserfiche WebLink
• <br /> D. Project Eligibility. A proposed project must meet the following requirements for <br /> consideration for a property tax exemption: <br /> 1. Location. The project must be located within the residential targeted area as designated <br /> pursuant to Section 3.78.150. <br /> 2. Tenant Displacement Prohibited. The project must not displace existing residential tenants <br /> of structures that are proposed for redevelopment. Existing dwelling units proposed for <br /> rehabilitation must have been unoccupied for a minimum of twelve months prior to submission <br /> of an application and must fail to comply with one or more requirements the Uniform Building <br /> Code or of the city's housing ordinance as set forth in Title 16 of this code. Applications for new <br /> construction cannot be submitted for vacant property upon which an occupied residential rental <br /> structure previously stood, unless a minimum of twelve months has elapsed from the time of <br /> most recent occupancy. <br /> 3. Size. The project must include a minimum of: <br /> a. Eight multifamily housing units; or <br /> b. Four multifamily housing units in a building in which all residential units are located above <br /> the ground floor in a building containing a minimum of four thousand square feet of commercial <br /> space on the ground floor; or <br /> c. Eight units of rehabilitated multifamily housing; provided, that conversion of buildings <br /> originally constructed as single-family dwellings to multiple-family dwellings shall not be <br /> eligible for the property tax exemption provided herein; and further provided,that existing <br /> multifamily housing that has been vacant for twelve months or more does not have to provide <br /> additional units so long as the project provides at least eight units of rehabilitated multifamily <br /> housing. <br /> 4. Permanent Residential Housing. At least fifty percent of the space designated for <br /> multifamily housing must be provided for permanent residential occupancy, as defined in <br /> Section 3.78.030 (E) and only that portion of the space designated for multifamily housing shall <br /> be eligible for the exemption provided for herein. <br /> 5. Proposed Completion Date. New construction multifamily housing and rehabilitation <br /> improvements must be completed within three years from the date of approval of the application, <br /> plus any extension of time granted under Section 3.78.090 (B). <br /> 6. Compliance with Guidelines and Standards. The project must be designed to comply with <br /> the city's comprehensive plan, building, housing and zoning codes, design guidelines, and any <br /> other applicable regulations in effect at the time the applicant submits a fully completed <br /> application to the director. For the duration of the exemption granted under this chapter, the <br /> 9 <br />