Laserfiche WebLink
2 <br /> Attachment A: Swift II BRT Project— Everett Ownership & ETA Continuing Control <br /> This attachment summarizes Swift II BRT Project elements to be transferred to Everett ownership and <br /> requiring assurance to FTA of ongoing maintenance and continuing control. <br /> Project elements to be owned and maintained by Everett include: <br /> • Right-of-way <br /> • Roadway, curb&gutter <br /> • Sidewalk <br /> • Traffic& Pedestrian Signals <br /> • Stormwater systems <br /> Location Direction <br /> Airport Rd at SR 99 Northbound <br /> Airport Rd at 112th St SW Southbound <br /> Airport Rd at 112th St SW Northbound <br /> Airport Rd at Kasch Park Rd Southbound <br /> Airport Rd at Kasch Park Rd Northbound <br /> 6 <br />