My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/02 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2016 11:02:57 AM
Creation date
11/9/2016 10:59:15 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/2/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
581
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Run Date: 9/14/201.6 City of Everett-Public Works Department Cutoff Date: 8126120/6 <br /> Time: 9:25 AM' Contract Estimate Voucher <br /> Project:330 For Work Order#3598A Contractor: ALLIED CONSTRUCTION <br /> WATER MAIN REPLACEMENT"P" Estimate#7 3120,HEWITT AVE <br /> WO 3598A BID:$230330.00 EVERETT WA 98201 <br /> TOTAL BID:$918,087.00 <br /> • <br /> Total Amt Previous Amt Present Amt <br /> Contract Totals to Date $224,033.65 $222,393.12 $1;640.53. <br /> Retained Amounts $11,201.10 $11,11.9.6 ] $82.03 <br /> State Tax Amounts $20;611..10 $20,460.17 $150.93 <br /> • Amounts Paid $233,.443.051 $231,733:6 <br /> ® Amount to be Paid This Estimate $1,709.43 . <br /> Checked By � 1/14((6,i1 Date <br /> c7-15-/ <br /> Recommended By 111.4 ,. 144.t-wk-g /, Date 1 I S ( <br /> Public.Works Director �� F� Date _ <br /> ` 1 <br /> Work Order Number: 3598A <br /> FINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.