My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3299-12
>
Ordinances
>
Ordinance 3299-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 9:22:50 AM
Creation date
11/10/2016 9:22:43 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3299-12
Date
11/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. a. Irrigation metered rates—water charge: <br /> First 600 cu. ft., 0-600 cu. ft. $25.08 <br /> Next 2,400 cu. ft., 600-3,000 cu. ft. $4.18 per 100 cu. ft. <br /> Next 12,000 cu. ft., 3,000-15,000 cu. ft. $2.64 per 100 cu. ft. <br /> Over 15,000 cu. ft $1.95 per 100 cu. ft. <br /> b. In addition, there shall be added a filtration charge of$0.597 per 100 cu. ft., $3.58 per <br /> month minimum. <br /> c. The following minimum monthly charge shall apply to all services to which water is <br /> available without regard to actual consumption: <br /> Cu. Ft. of Water Minimum Charge <br /> Provided at Minimum Minimum W/0 Regard to <br /> Meter Size Minimum Charge Water Charge Filtration Charge Consumption <br /> 1/2 - 3/4 inch 600 $25.08 $3.58 $28.66 <br /> 1 inch 1,000 $41.80 $5.97 $47.77 <br /> 2 inch 1,200 $50.16 $7.16 $57.32 <br /> Over 2 inch 1,600 $66.88 $9.55 $76.43 <br /> 5. Untreated Industrial Water: <br /> Meter Charge $2,268.00 monthly <br /> Commodity Charge $541.00/MG <br /> 6. a. City installed service connection charges: <br /> 5/8 x 3/4 inch $2,514.00 each <br /> 1 inch $2,516.00 <br /> 2 inch $4,402.00 <br /> b. Service connection installations larger than the two-inch size shall be charged at the <br /> actual cost of the complete installation. <br /> c. Said charges include an $84 non-refundable application fee. Service connection <br /> applications shall be valid only for 180 days from date of issue unless work is in <br /> progress or a reasonable time extension is granted by the Public Works Director, <br /> Service connection charges (less said non-refundable application fee) may be <br /> refunded to the applicant in the event that refund is requested within one year from <br /> the date of issue. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.