My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3338-13
>
Ordinances
>
Ordinance 3338-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 9:52:54 AM
Creation date
11/10/2016 9:52:51 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3338-13
Date
9/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2013 <br /> Budget Adjustments <br /> Tally Sheet <br /> Department Code Rev Exp FB <br /> NGA-6 Criminal Justice Fund 'Amendment-New World Project 156A 35,484 I (35,484) <br /> This amendment provides the authority to transfer$35,484 to the Information Technology <br /> department for support of the New World Project. <br /> Please see GGA-11 for additional information. <br /> Increase Criminal Justice transfers out 156 5300470550 35,484 <br /> Decrease Criminal Justice ending fund balance 156 5980000999 35,484 <br /> Department Code Rev Exp FB <br /> NGA-7 Joint Water Line Amendment-Joint Water Line Project 451A 1,200,000 I 1,200,000 <br /> This amendment will increase the Everett-Tulalip Joint Water Line Fund expenditure budget by <br /> $1.2 million to finance capital projects related to the joint water line project. This will bring the <br /> 2013 budget to $1.4 million. Funding for this project is shared between the City's Utility fund <br /> and the Tulalip Tribe. <br /> Increase construction budget 451 5100119107650 1,200,000 <br /> Increase revenue budget 451 3371000000000 1,200,000 <br /> Department Code Rev Exp FB <br /> NGA-8 IMVD 'Amendment-Lift Replacement 501A 125,000 I 125,000 <br /> This amendment requests an increase to the Motor Vehicle Department's (MVD) budget of <br /> $125,000 to replace one of two in-ground hydraulic vehicle lifts at MVD's main shop. The current <br /> lift is approximately 40 years old.The combination of a fixed cylinder being in the ground (with <br /> no secondary containment vault and subject to corrosion and electrolysis) and the lack of lift <br /> locks makes for potential ecological and safety issues. The project is anticipated to be completed <br /> by the end of the year. Funding for this project is from Fund 126-Motor Vehicle Reserve fund. <br /> Increase equipment budget 501 5100000640 125,000 <br /> Increase transfers in 501 3970000126 125,000 <br /> ATTACHMENT A <br /> Tally 2013 8/21/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.