My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Works 10/18/2016 Change Order 1
>
Contracts
>
Capital Contract
>
Public Works 10/18/2016 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 11:51:01 AM
Creation date
11/14/2016 11:50:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Works
Approval Date
10/18/2016
Department
Public Works
Department Project Manager
Corey Hert
Subject / Project Title
Pacific/Broadway & Citywide Safety Impvts
Public Works WO Number
PW 3523 & PW 3524
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000050
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 5/9/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Pacific&Broadway/Citywide Safety <br /> Improvement Projects <br /> Change Order No.: 1 <br /> Change Order Effective Date: 09-02-2016 <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 3. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including,but <br /> not limited to, claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute,claim, or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> 4i1110V1 411409----164 <br /> ',r giYcl75/,Da e: �afQ (K, (J I , 1 O' 1 zf,V <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> /1 A <br /> I A) i_ �.i <br /> Date: /.t Date: - Da �: <br /> q-2L'1 to D e: `l 2(,-((o �� �/ <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.