My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers 10/17/2016
>
Contracts
>
6 Years Then Destroy
>
2016
>
GeoEngineers 10/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 11:02:41 AM
Creation date
11/16/2016 11:02:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers
Approval Date
10/17/2016
End Date
12/31/2016
Department
Facilities
Department Project Manager
Mike Palacios
Subject / Project Title
Smith St Mill Property Phase II ESA
Tracking Number
0000321
Total Compensation
$39,300.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> REIMBURSABLE EXPENSES <br /> Type of Expense Maximum Per Item Cumulative Maximum <br /> Parking NA <br /> Meals NA <br /> Environmental Exploration <br /> Equipment $150/day <br /> Peristaltic Pump $50/day <br /> • Electrical Tape $25/day <br /> Estimated reimbursable expenses for <br /> subcontracted drilling and drum disposal, <br /> excavating/test pit servies, and chemical <br /> analysis are shown on Page of Exhibit A. <br /> Charges for subcontracted services are <br /> cost plus 15 percent. <br /> Refer to Schedule of Charges-2016 <br /> which is attached and forms a part of <br /> this agreement for additional unit <br /> rates for Equipment. Mileage to be <br /> billed at IRS mileage rates. <br /> GeoEngineers,Inc. <br /> File No.0661-108-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.