Laserfiche WebLink
Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Believue, WA 98009 <br />CIVIL FNGINFf-:FIING, I.AP10 PI.ANNIt4G, ;URVGiYING <br />November 17, 2015 <br />Eddy.stevens@Polygonhomes.com <br />RE: Final Letter for Building 10 <br />Si{veriake Center <br />11208, 11206, 11��4, 11202, - 191:h nR SF, Fver�ti_ W�shin�ton <br />Our Job f�Jo. �9180 <br />Based on our periodic inspections, it appears that the interiar and Exterior Shear, Frame, Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Building 10 at Silverlake Center is in <br />substantial compliance with RCW 64.55 and is in substantial compliance with the approved drawings <br />(based on plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this office. Thank you. <br />Respectfully, <br />� �- � <br />..� ,~' <br />r .� � �,.-'` � _�.,... .. . <br />}, .��„_._w.�_... <br />� .� ...,� .. <br />��.;- ��i.,.�'�`� r �- °!z..�, <br />Hai P. Grubb, P.E. <br />Director of Engineering Services <br />H PG/ns <br />19780c.013.doc <br />cc: Ron Smith, Polygon Homes <br />Jefif Jacobsen, Polygon Homes (via email) <br />Thomas Heinz, Polygon Homes (via emaii) <br />Frank Meilas, Sound Inspections, LLC (via er�nail) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />18215 72ND AVENUE SOUTM KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX --� <br />BRANCH OFFICES • TUMWATER, WA � LONG BEACH, CA � RDSEVILLE, CA • SAN DI�GO, CR 1 <br />www.harghausen.com � <br />/ <br />