Laserfiche WebLink
�� �--t � �.��.� <br />� ... ��f�� � <br />� u <br />0 2 <br />L tI � �::0 <br />s� Iir�,►;;�` y. <br />� <br />CT�'�'c ENGt�j4� <br />Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Bellevue, WA 98009 <br />r,iv:i r�N�iw-r�i;irdc, i_aNn I�inrdNinir., slr,zvrvirac <br />November 20 2015 <br />Eddy.stevens@Palygonhomes.com <br />RE: Final Letter for Buiiding 9 <br />Silverlake Center <br />11218, 11216, 11214, 11212, 11210 - 19th DR SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame; Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Building 9 at Silverlake Center is in substantial <br />compliance with RCW 64.55 and is in substantial compliance with the approved drawings {based on <br />plans prepared by Milbrandt Architects dated February 4, 2015). <br />If you have any questions or need additional information, please contact me at this office. Thank you. <br />Respectfully, <br />� p��� ... <br />� ,,� � .,.�...�- �� �. <br />Hal P. Grubb, P E. <br />Director of Engine2ring Services <br />HPGIns <br />19780c.014.doc <br />cc: Ron Smith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (via err�aiQ <br />Thomas Heinz, Polygon Homes (via emai!) <br />Frank Mellas, Sound Inspections, LLC (via email) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />1i3215 72ND AVENUE SOli7H iGENT, WA �JII032 (425j 251-62`L2 (425) 251-87II2 FAX <br />aRANCH QFFIC�S > TUMWATER, WA a LONG BEACH, CA < ROS�VILLE, C1/� « SRN DIEGO, CA <br />www.baryhausen.com �' """") ' <br />_,, <br />� % <br />