Laserfiche WebLink
Eddy Stevens <br />Silverlake Center, LLC <br />P.O. Box 1349 <br />Bellevue, WA 98009 <br />CIVIL ENGINECRING. LFlND PLANNING, SURVf-YfNG <br />October 20, GO � J <br />Eddy.stevens@Polygonhomes.com <br />RE: Final Letter for Building 7 <br />Silverlake Center <br />11230, 11228, 11226, 11224, 11222, & 11220 - 19th DF� SE, Everett, Washington <br />Our Job No. 19780 <br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap, <br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Building 7 at Silverlake Center is in substantial <br />compliance with RCW 64.55 and is in substantial compliance with ti�e approved drawings (based on <br />plans prepared by Miibrandt Architects dated February 4, 2015). <br />If you have any questions or need additionai information, please contact me at this office. Thank you. <br />Respectfuily, <br />. <br />// ��- _ <br />Hal P. Grubb, P.E. <br />Director of Engineering Services <br />HPG/ns <br />19780c.011.doc <br />cc: Ron 5mith, Polygon Homes <br />Jeff Jacobsen, Polygon Homes (via email) <br />Thomas Heinz, Polygon Homes (vra email) <br />Frank Mellas, Sound Inspections, LLC (via emai!) <br />Nancy Scott, Barghausen Consulting Engineers, Inc. <br />18215 72ND AVENUE SOUTH KENT, WR 98032 (425) 251-6222 (425) 251-8782 FAX <br />BRANCH OFFIGES • TUMWATER, W� � LONG F3EACH, CA < R�SEVILLE, CA • SFlN DIEGO, CA � <br />wNiw.barghausen.com , <br />:i <br />