My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11221 19TH DR SE 2016-11-18
>
Address Records
>
19TH DR SE
>
11221
>
11221 19TH DR SE 2016-11-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 5:58:51 AM
Creation date
11/18/2016 8:28:31 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH DR SE
Street Number
11221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 3, 2015 <br />ES-3588.01 <br />�a�fh : <br /><r, =:' :�O�U�'lOI1S' <br />Nwt« � <br />Earth Solutions NW LLC <br />° i.,C�'�il'.[�i!"ii(�.di! ?..!',�',IRC'e'i?'ly <br />° (_�:;YiSt.fUCt�iCiti tl'':��Ilitiill'it�. <br />° fl'f`;f?:;f`fl'.�'.'1id! _+r'IC`I'Ct'.; ' <br />Polygon NW <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />� �eniio� �: i+�i. Eddy Stevens <br />Subject: Final Report <br />Building 7, Lots 7.1 thru 7.6, <br />Building 8, Lots 8.1 thru 8.4 and <br />Building 19, Lots 19.1 thru 19.8 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />Building 7- 11220 thru 11230 — 19th Drive Southeast <br />Building 8- 11217 thru 11231 —'i9th Drive Southeast <br />Building 19 - 11018 thru 11032 — 20th Drive Southeast <br />Everett, Washington <br />Dear Mr. Stevens: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring and consulting services at the subject site. Our services included providing onsite <br />ahservations and tesiing on a parf-ti�7�e frorn February '13 ia April 27, 2015. Our <br />representatives made eight site visits to observe building foundation subgrade and test buiiding <br />slab backfill. <br />Our representative observed building foundation subgrade to be dense and suitable for support <br />of the proposed structures. <br />Our representative conducted 24 field density tests in accordance with ASTM Test Designation <br />D2922 (Nuclear Gauge Method). Two representative soil samples were returned to our <br />laboratory for analysis of the maximum dry density and opfiimum moisture content in <br />accordance with ASTM D1557-02 (Modified Proctor), Density test results indicate adequate <br />compaction of at least 95 percent at the tested locaiions of the building slab backfill. <br />Sased on our obse+vations and testing, the earthwork construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. - <br />. , " ; i{ ih i'1, _ `. r "... � i<C , !r,. - %S'; �1 4,'•'.? � + i-:�ia:.�42�; ,j•_`}-;?I"I <br />
The URL can be used to link to this page
Your browser does not support the video tag.