|
Eddy Stevens
<br />Silverlake Center, LLC
<br />P.O. Box 1349
<br />Bellevue, WA 98009
<br />CIVIL FNGINFERING. LANfI PLAIJNWG, iURVE`(ING
<br />November 6, 2015
<br />Eddy.stevens@Polygonf�omes.com
<br />RE: Final Letter for Building 18
<br />Silverlake Center
<br />11126, 11122, 11118, 11114, 11110, 11106, 11102 - 20th DR SE, Everett, Washington
<br />Our Job No. 19780
<br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap,
<br />Window Wrap, Lateral Bracing, Roof and ,Exterior Final for Building 18 at Silverlake Center is in
<br />substantial compliance with RCW 64.55 and is in substantial compliance with tl�e approved drawings
<br />(based on plans prepared by Milbrandt Architects dated February 4, 2015).
<br />If you have any questions or need additional information, please contact m, e�t this office. Thank you.
<br />-"/
<br />RespectfulJy;'t�`
<br />/ %� � " - �
<br />� � � f
<br />�� �'� '� '"='`���� —
<br />5 % -'' - � --- -- —%' --7
<br />7, ��� / , � �..__ �.�= -
<br />� ..._ — -
<br />Thomas A. Barghausen, P.E.
<br />President
<br />� I f\Bri�is
<br />19780c.012.doc
<br />cc: Ron Smith, Polygon Homes
<br />Jeff Jacobsen, Polygon Homes (via email)
<br />Thomas Heinz, Polygon Homes (via ernail)
<br />Frank Mellas, Sound Inspections, LLC (vra ernait)
<br />Nancy Scott, Barghausen Consulting Engineers, Inc.
<br />a, £'• ,�
<br />�. _...
<br />�.. �, ..` , > v;;a"�f.�";
<br />,
<br />��",, ,,c ,.._ 4 G�
<br />�
<br />F-�-1 G� ���� ./�
<br />/�
<br />- "'�I�AL `�'�''
<br />�EXPIRES 12112/��-�`�
<br />1f3275 72ND AVFNUE SOUTFI KEN7, WA 98032 (42.5) 251-6222 (425) 251-87E32 P/1X
<br />BRANCI-i OFFiCES • TUMWATER, WA > LONG BL-ACH, GA • ROSGVILLE, CA • SAN DIEGO, CA
<br />www.barghausen.com
<br />��
<br />' -1
<br />
|