Laserfiche WebLink
.; <br />�^PDS Project Details <br />_ <br />� � � � � � 1 � � t}ntfne Gav�err�rn�nt iniarmat�an � Ser�{cas <br />������r <br />�r�������� <br />Search > Parcels > Activity > Details <br />PDS Project Details <br />The information below summarizes the project you selected. <br />(Printable version) <br />Parcel (Tax Account) Number: 009022-000-029-00 <br />Address: 12632 21 ST AVE SE, EVERETT, WA 98208-6540 <br />Project File Number: <br />00-103022-000-00-RK <br />Application Date: 3/28/2000 <br />Project Type: Residential Permit - <br />Combo <br />Information: <br />Front Setback: 10' frm both front P/L's <br />alg. 127th PI. SE & 21st Ave. SE w/15' <br />min. driveway length <br />Rear Setback: 5' <br />Type of Construction: Average <br />Crit Areas Ord: Non-Exempt-Urban <br />Main Floor SF: 1116 <br />Covered deck/porch: 24 <br />Building Height: 25' <br />Septic/Sewer: Sewer <br />Heat Source: Natural Gas <br />No. of Heat-Type Units: 1 <br />Gas Piping Outlets: 3 <br />Current Status: Closed <br />Issue Date: 5/16/2000 <br />Type: SFR-Basic <br />Side Setback: 5' <br />Valuation: 100, 583.76 <br />Basic #: 98-109408 <br />Basement SF: 589 (finished) <br />Garage SF: 459 <br />Building Dimensions: 24x58 <br />Other struct. on prop.: None <br />Access Permit #: 00-103022 <br />Heat Type: Forced Air <br />Exhaust Fans: 5 <br />Zero Clear-Gas: 1 <br />Description: <br />Approved Basic #98-109408BP Plan: 1705 <br />FR w/finished lower floor - 1997 UBC <br />Conditions: <br />1. Design by Jeffery P. deRoulet, Arch., #5046. <br />2. Lots 1-48 are subject to an approved drainage plan for lot development that <br />requires impervious surfaces & drains to be connected to the plat storm drainage <br />system. Impervious surface area not to exceed 2,400 sq. ft. The storm drain pipe <br />from the house shall have a positive drainage flow to the plat storm system. The <br />pipe is recommended to be 4" (inch) min. PVC and conform to A.S.T.M. standards <br />and specifications. The drain pipe trench shall be left open until the county building <br />inspector has approved pipe placement in the trench and connection to the storm <br />drainage system. (Note: see the drainage plan for additional information and location <br />of the drainage system) <br />3. The drainage system design engineer has not established a minimum ground <br />crawl space elevation for the lot. However there are minimum finished floor <br />elevations established for sanitary sewer connection. As appropriate to the design of <br />the house, the finished floor elevation is shown on the attached exhibit or table. 4. <br />�'Page 1 of 2�` <br />; <br />http://198.238.192.103/pds/pdskiosk/PDS-ProjectDetails.asp?PolderRSN=436312&Proper... 12/6/2007 <br />