Laserfiche WebLink
CITY OF EVERETT-PROJECT NAME DATE <br /> CONTRACTOR <br /> By Date: // /4 7204 <br /> Officer <br /> Exhibit A- <br /> During the course of performing masonry and cleaning repairs to the Police Headquarters <br /> Building it was discovered that much of the steel support for the upper areas of the <br /> building (top floor lintel) are deteriorated to the point that little to no material is left to tie <br /> into. This support structure needs to be replaced to provide long term structural support <br /> for the brickwork. The proposed change order would provide for Alpine Waterproofing to <br /> continue and include the replacement of the upper floor lintels in addition to the original <br /> scope of work. <br /> CONTRACT MODIFICATION PROCEDURES 01 2600 - 6 <br />