Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per i,ity Standard#601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runof must be discharged to a roof downspout infiltration system per City of Everett Storr,i <br /> Manual 3-2.6.2. The approximale size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss poten. 31 drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> ba�es, swales, or erosion blankets. <br /> �11� Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> _,�. <br /> * 13.. ' All excavated material from foundation, sidewalk and driveways shall be hauled to ac approved, <br /> permitted site. No wasting of material is allow�d on this building lot. <br /> � No dirt, mud, rocks or debris to be trecked onto roadway. <br /> 15 No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by l'ne Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must:� ;eplaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> _.�.., <br /> � 19. Pave driveway from the front property line out lo the street paving. <br /> 20. Contact the Water Dislrict fur connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is lo be installed,the pressure line must discharge into a private msnhole,then , <br /> gravity flow across the public right-of-way. <br /> 23 A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FGR PUBLIC WORK� INSPECTION, CALL F2ANDY AT 425339-7403/CLIFF AT 425339-7404 <br /> .�^romm�ots � <br /> Z/2' <br />