Laserfiche WebLink
INSPECTION REPORT -`, <br /> Address ��� � L��C�`^"� S -- <br /> Contractor_ �����-- <br /> A�f`n� Owner — ' <br /> � � W - � - �6 <br /> Date <br /> J APPROVAL J PARTIAL APPROVAL <br /> J VIOLATION :.I CORRECTION REQUE�TED <br /> J Corrections listed below MUST BE MADE before work can be approved. <br /> J Please contact inspecror and arrange for appointment. <br /> �Was.not able to perform inspection. <br /> �CALL 259•8810 FOR REINSPECTION–24 hour r,otice reauired <br /> A CERTIFlCATE OF OCCUPANCY SHHLL BE ISSUED AND POSTED <br /> ON THE PREMISES PRIOR TO OCCUPANCY. <br /> � Inspecto Dat / <br /> PE OF NSPECTION RE�UESTED <br /> � J Tem . Elect. J Framing J Gas Pip��ng <br /> J Footing J Drywalf,Nailing J Consol^ation <br /> jd'FDondalion J Shear Nailing J Groundwork <br /> 7 Ductwork J Grid J Struct. Slab <br /> ❑Wood Stov� J Rough-in J Final <br /> ]Masonry ]Service J Insulatior, <br /> J Other <br /> �'1'BLBG: Pmt.No. ��MECH:Pmc No. — <br /> J ELEC: Pmt.No. —'J PLBG:Pmt. No.-- � <br /> I <br /> , II <br />