Laserfiche WebLink
Plan Check Basic #B0308-017 <br /> August 18, 2003 <br /> � Page 3 of 2 � <br /> 3 Revise height calcu!ations—show all measurements in feet and decimals of a foot. If you use the <br /> top of the oil fill pipe as a reference point, the top of the pipe should be= 100')feet). <br /> 3. Show height calculations including reference point on the elevation view. <br /> 4. Label where all dimensions aze to and from on elevation view; i.e., finished floor,top plate,etc. <br /> Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and pl..n review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient informatior to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> ���� <br /> r <br /> Jeff Heilman <br /> Development Technician <br /> S`JLmdsaNWORDViEILMAN,i�Plan Check#80308-017.d� <br /> Z/� <br />