Laserfiche WebLink
everett INSPECTION REPORT <br /> � Address �� <br /> Contractor <br /> Owner � �p <br /> Date _ ������ <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. U MECH: Pmi. No. <br /> ❑ ELEC: Pmt. No. ��' PLBG: Pmt. No. — <br /> ❑Temp. Elect. ❑ Framing ❑Gas Piping <br /> � ' ❑ Footing ❑Drywall,Nailing ❑Consultation . <br /> ❑ Foundation ❑Shear Nailing ❑Groundwork <br /> � � ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑ Rough-In d cinal <br /> ❑ Masonry ❑Service ❑ <br /> PPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION C CORRECTION REQUIRED <br /> ❑Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> ❑Was not able to perform inspection. , <br /> � ❑CALL 259-8810 FOfi REINSPECTION—24 hour notice�equired. ' <br /> A CERTIFICATE OF OCCUPANCY SHALL BE�SSUED AND POSTED ON ' <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> �� s�� �i.f � <br /> inspector __� � Date/� " <br /> I <br />