My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10411 AIRPORT RD 2018-01-01 MF Import
>
Address Records
>
AIRPORT RD
>
10411
>
10411 AIRPORT RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 3:00:33 PM
Creation date
11/22/2016 4:38:47 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
10411
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�aee�eu�r��N�. � Quate <br /> �,.,�..�.e.�.�. <br /> ��� <br /> ,sa2� „�sw <br /> Seattle WA 98166 Guob NO:janswfld�ck2 <br /> (206)241-5990 FAX(206)2�i8-9430 DATE: F�Muary 5,2001 <br /> Ta TERRY ERVIC Ship To: <br /> Jar�sport Same <br /> 104�11 Airyort Rd. SW (freight not included) <br /> Evsrett,Wa. 98204 <br /> CONT�RCT SUBJECT LEAD TIME SHIP W1 F.0.8. 1NT TERMS <br /> V1fi11 Hdrt Meu.revision 4-6 wks to ship Best As noted Net 15 oac <br /> date after app. <br /> pUANTITY DESCRIPTION UNIT PRICE AMOUNT <br /> 1 Wildeck meuanine system wilh UBC standard stair and platlorm. 8'x 4683.00 54,883.00 <br /> 20'"c'style consWction with'/."ptywood floor decking and mefal roof <br /> deck underlayment to match existing. Indudes separate column <br /> system on 8'x 20'centers with 12"x 12°baseplates. Includes standard <br /> gray finish and hardware. <br /> �wc�r�. .a2r� <br /> 1 Optipnal qSH1S "U"syde staiiway with closed tread and risers per 622 3622.00 <br /> meetings(requires Ciry of Everett approvaq a���!��-� <br /> 1 Optional seismic engineering report for permit applicaGon. Includes 1000.00 E1,000•00 <br /> drawings, cakulations, and PE seal for Wa. State. (add) <br /> � 2818.00 t2,818.00 <br /> ptional insWllation inGuding layout,erection, railing and kickplate <br /> nstallation(materials shown bebw)and stair installalion. Does not <br /> ndude any building modficatlons,existing system modifications H <br /> uired(other than reil removaq,a permits/fees/fire systeMelecbrcal. <br /> orkliR sy others. (add) <br /> 1 Lot rail and kickplate per UBC requirements(estimated at 26 L.F). (add) 417.82 5417.82 <br /> 1 Freight to destinatio� 1897.59 51,897.59 <br /> -All ftems shown assume City of Everett buikling dept. approval. Fire <br /> systems and permits are not included. Modificationx roquired by <br /> IocaUubc jurisdicito�s are not included. Installakon assumes free and <br /> clear area and is based on normal work week hours with rron-unan <br /> SU9TOTAL 571,438.41 <br /> SALES TAX i983.71 <br /> Total as show� 517,422.12 <br /> Gsnenl Terms and Condkbm <br /> 1. Pricq aro valid tor 30 days. Th�nait�r Hay aro wbj�et to eMnp�wNhouf notlee. BNMep(br�N on�Ib ' <br /> at tlrth oi arrivaL <br /> 2. All prices quoted A�rin aro subj�st to sabs or WMr tu�s.N applkabN. (��1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.