My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11611 AIRPORT RD 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
11611
>
11611 AIRPORT RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 10:43:15 AM
Creation date
11/22/2016 4:45:29 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11611
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Mietzner ;. � <br /> nvzmuvoinomra�ne��3�o,�a=m., V//��/'� <br /> V � <br /> Hand Delivered <br /> November 20,2006 <br /> Kirk Brooks and Gordon W itcher <br /> Ciry of Everett Building Deparhnent <br /> 3200 Cedar Street <br /> Everett, WA 98201 � � f ,�d, <br /> 115.33-p � <br /> Re: Pertnit No's: PW0503-0111B0503-009 �i:�_y`t-� � � � �� � <br /> Dear Mr. Brooks and Mr. Witcher, <br /> The above referenced perntits were issued on June 30, 2006. According to the Public Works Pemtit <br /> and the Construction Pemiit, these pemuts exp've if work is not commenced within 180 days and <br /> thereafter is to be diligently pmsued to completion. <br /> This letter is to request the pe�mits to be extend:d since our wo�k will not ccmmence until Late <br /> Spring/Early Summer, 2007 due to reaso^.s ouHined below. <br /> Revisions were recently made to the civil engineering drawings and site plan due ro revisions to the <br /> building from a single-story with basement to 2-story with basement and addirional parking, <br /> eliminating the wetpond in buffer by replacing i[ with a stonn filter under the road, and aµider 3S <br /> radius in the pazking azea for fire apparatus. We received an Addendum to the originally issued DNS <br /> on August 31st,2006 that addressed said changes. - -� <br /> � y;- <br /> More vnportantly,we recently conducted geotechnical test pits and discovered a significant <br /> amount of poor, unsuitable fill that must be removed and the requirement to import structural fill. <br /> Unfortunately,we aze now in the rainy season. Our geotechnical engineer and contractor have <br /> recommended that we delay start of the work until Spring or even Summer,2007 when erosion <br /> control methods will be bener managed and the soils will be more conducive to excavation, <br /> backfilling and compacting. Moreover,the site is adjacent to a sensitive area wetland and stream. <br /> Finally,the structural engineer finalized his set of plans and sent them to the architect. The <br /> azchitect will be turning in the revised set of plans tius week to the City for iYs review. <br /> Please consider this request for pennit extensioa Should you have any questions,please give me <br /> a call at 425-754-9651. <br /> Sincerely, j �t c�^ �, <br /> _ . �� h <br /> ��r.•�� �� <br /> .�../`J/��/ � �70 ,a;� . <br /> / `� ��,�i�/���:�����c�^ � T YI� �i�- <br /> Mike M�etzner <br /> Mie[zner Business Pazk. LLC <br /> � <br /> www.MievncrGrnupsnm � IN913 Bothell-Everett Hwy � phone 425.482.9110 <br /> InfnCn.MietmerGrou�cum .. Bothell.WA98012 �� fax 425482.1899 <br />
The URL can be used to link to this page
Your browser does not support the video tag.