My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11825 AIRPORT RD 2016-01-01 MF Import
>
Address Records
>
AIRPORT RD
>
11825
>
11825 AIRPORT RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2016 11:02:11 AM
Creation date
11/22/2016 5:03:23 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11825
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I �rz�. ��e � Northern, mc. <br /> � Project No.29E-801 <br /> Footing widtlu should compiy with applicable building codes. All penmeter footinga <br /> ' should be at last eighteen(18) inches below the final extaior grade for frost protection. <br /> Prior W footing ptacement, any wR, loose or wa uas encountercd in the footi� <br /> r_ areas should be removed and replaced with stnictural 611, angular uushed rock,contrmUed <br /> densiry fill(CDFylean mix conccete or additional footing cone�ete. The crushed rocic or <br /> atructural Sil sGould be plaud in uniform liRs and n�echaaically compacted between GRs. ' <br /> ( We recommead that we be engaged to verify excavation to witabie beazing susta prior W <br /> foundation placement and w observe placement and compaction of the bac�IL , <br /> � Following is a discussion of two(2)opaons for placement of the proposed building I <br /> foundation aad slab-on-grade. Sdection of the chosen option wiil be based on costs u►d ease <br /> of consuuctioa In addidon, Optioa II as prasented below iavolva consideration by t4e <br /> �_ ow�r whethu to accept some risk of setdement in stab areas. <br /> 63.1 Option I <br /> � <br /> We rccommend that the uncontrolled fill and loose soil be excavated from the <br /> ( proposed building and siab azeas to a wbgade consisting of the on-site native,brovm sandy <br /> L gravet(GP)that is dense. The excavations shouid extend a minimum of four(4)fat beyond <br /> the outside edge of the proposed footings. <br /> CWe raommend that this subgrade be compacted with a vibratory plate compactor W a <br /> firm and unyiddi g state.The entire building foundatioa and slab azea should then be braight <br /> ' � up m slab subgraae elevation wiffi propaly placed and compacted stcuctural fill. We <br /> recommend footing trenches should then be excavated within the compacted stcuctural fill to <br /> t6e minimum frost protection depth(18 inches beloasthe acterior finished grade). <br /> l63.2 Option II <br /> � We rccommend excavating footing uenchas through the on-site u�ontrolled fill to t6e <br /> native bearing wit described above. The buiiding's footings may then be placed directly on <br /> I bearing soil. Altanatively, CDF/lean mix concrate,structural fill or compacted cnuhed rodc <br /> j � may be placed on the bearing soil and the footinas may then be placed on the structurat SU. <br /> tn case of CDF/lran mix concrete,the footing trmch should extend a minimum of one <br /> � (1)foot on either side of the proposed footiqgs. If you dect to use suuctura1811 or ccushed <br /> rock option,then the footing trenches should extend a aunimum of four(4)feet on both sida . <br /> of the proposed spread footings. <br /> ' � This option includes placement of buiiding siabs on the adsting uncoiarolled 6t1. We <br /> � recommend that this in-situ uncootrolled fili be over excavated at least two(2)fat below the <br /> slab subgrade elevation. The exposed subgrade should then be proofrolled and mechanically <br /> compacted prior to placing structural fill ¢onsisting of ccushed eock to slab subgade <br /> � elevation. <br /> , ! S <br /> � - <br />
The URL can be used to link to this page
Your browser does not support the video tag.