My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:35:52 PM
Creation date
11/22/2016 5:26:42 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ <br /> .�� ,� <br /> S' ;`aJ �+y 1 \\ 1 <br /> �0 �C �, ti�' ADDENDUM TO FINAL REVISED <br /> p�C 13 1g93 ..M4TIGATED DETERMINATION OF NON SIGNIFICANCE <br /> .EVERE�S. SEPA 50-92 <br /> _.P�`OF'.. <br /> "•••�•C�j . WorkS peP�Mukilteo School DistncYs Central Facilities Complex <br /> Description of Proposal: The proposed action is the issuance of Public Works <br /> and Building Permits for the proposed expansion of the Mukilteo School DistricYs <br /> Central Facilities Complex. The proposed project includes the construction of a <br /> new central kitchen (17,540 s�, and transportation (16,993 s� and maintenance <br /> office facilities (8,500 s�. The project also includes the filling of .096 acres of <br /> wetlands and the creation of .289 acres of wetlands. <br /> Proponent: Mukilteo School District No. 6 <br /> 9001 Airport Road <br /> Everett, WA 98204 <br /> Contact: Mark Peterson, 258-6471 <br /> Location: 9001 Airport Road <br /> Zoning: R-S <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Faheem Siddiq, (206) 259-8731 <br /> The Final Revised Mitigated Determination of Non-Significance (SEPA #50-92) <br /> is hereby amended as follows: <br /> 1. Paragraph No. 12 on Page 4 of the Final Revised MDNS is amended to <br /> read as follows: <br /> 12. The bus wash and fueling area must be hydrologicaliy isolated <br /> from the storm drain system. The City of Everett's Industrial <br /> Pre-treatment Program should be con?acted about requirements for <br /> discharging wash water to the sanitary sewer. <br /> 2. Paragraph No. 17(g) on page 7 of the Final Revised MDNS is amended to <br /> read as follows: <br /> 17(g). Analyze onsite hydrology of Wetland E to determine source and <br /> quantity existing wetland hydrology. Existing hyd�ological analysis <br /> performed by CT for Wetland A will be used by the applicant to <br />
The URL can be used to link to this page
Your browser does not support the video tag.