My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:35:52 PM
Creation date
11/22/2016 5:26:42 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•�he actual contours for the swale and how they relate to the <br /> a�l�� surrounding topography should be shown. ' <br /> �r�� `1J5�Lr�� Ve etated swales are to be desi ned with a minimum freeboard " - <br /> y�� ��� S�� ofg0.5 feet above the maximum design depth. <br /> Y��J'� � <br /> City standards require the entire associated side slope of <br /> �� the swale, from the bot=om of the swale to the top of the <br /> , � !'e adjacent bank, to have a maximum slope of 3: 1 unless <br /> ��� a� rockeries or retaining walls are used. Rockeries or <br /> U,k�' • retaining walls may be used to provide the vertical drop ! � <br /> � ��`r5 necessary to meet the swale side slope requirements, but the `�� <br /> ��� rockery or retaining wall may not be used to provide the <br /> required 0.5 vertical feet of freeboard. <br /> The maximum design depth of flow in the swale should be <br /> shown on the swale cross-sectional detail. <br /> Wetoond• <br /> � Rip-rap should be placed from the inlet to the bottom of the <br /> pond. At the end of an extended dry period and/or lsefore r� <br /> the pond bottom seals, the water level in the pond can be <br /> significantly lower tha., the design level and erosion can <br /> occur at the inlet area. <br /> The elevation of the overflow spillway midway along the <br /> eastern wetpond wall should be called out. T"- ^' *� n <br /> � ,a s.e cl ;aht�v ti • r.e.._ <br /> �^" --r, -o�-t-�e-overflow <br /> st - asin. �%'� _ <br /> n�fk�� oil/water seoarator: <br /> �e,hh�-�a� �( A detail of the vault should be included on the plans � <br /> � �` clearly showing the inlet and outlet elevations of the <br /> Y-�,cJ W,F-�k���5 separator, the elevation of the bottom of the separator, and <br /> i5s�e } VU � the position and height of interior baffles. <br /> �,esPe` �P �� � <br /> �3���'tir ���outletparato��PouSd be �l��a mathbe !�l�lw {- �-oe:,ernc�e � v, r�- <br /> S�Pv�.;o�� o^ �.�Iccatv��n.,Fttu 54andpYus, w.dL.nest�i4t�--Iv �'trut 3ccess ho�Z . oj• <br /> �-d�� �;�'er The oil/water separator maintenance notes from section � <br /> , � „y 4.11.1 of the City of Everett Design and Construction <br /> ��' �n��� Standards and Specifications need to be included on the <br /> �IU''� drainage plans. <br /> Diversion structure: <br /> If the plans are changed to propose a bypass system for the <br /> oil/water separator and swale system, the following comments <br /> are typical. <br />
The URL can be used to link to this page
Your browser does not support the video tag.