Laserfiche WebLink
� <br /> INSPECTION REPORT '` <br /> � Address --��`� <br /> ���� — <br /> Contractor <br /> �� Owner ��2�0� <br /> � 30-9� - <br /> �,-y�� Date <br /> PPROVAL 0 PARTIAL APPROVAL <br /> p VIOLATION ❑CORRECTION REQUESTED <br /> J Corrections listed bebW MUST BE MADE before work can be approved. <br /> U Please contact inspector and arrange for appointmeM. <br /> �,�Was not able to perform inspeclion. <br /> -�ppLL 259-8810 FOR REINSPECTION-24 hour notice required <br /> ON THE PREMISES PR�Op TO O�CUPANCY.U�D AND PCSTED <br /> � � o..tt\ <br /> �� 1 <br /> Date <br /> nspec�or <br /> OF INSPECTION REQUESTED <br /> ming ❑Gas Piping <br /> emp.Elect. �Wyll,Nailing 7 Consultation <br /> Footing . p Shear Nading '..1 Groundwork <br /> . J Foundation ❑Grid J Struct. Slab <br /> U Uuctwork ❑Rough-in ]Final <br /> ❑Wood Stove �$eN1Ce J Insulation <br /> '�M�O^ry ❑Other <br /> �LDG:Pmt. No. <br /> ,$-/S� p MECH:Pmt.No.------ <br /> ❑ELEC:Pmt.No.------ <br /> 'J PLBG:Pmt.No. <br />