My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
306 ALDER ST 2018-01-02 MF Import
>
Address Records
>
ALDER ST
>
306
>
306 ALDER ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 12:03:09 PM
Creation date
11/22/2016 6:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
ALDER ST
Street Number
306
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. May�> 200� ( <br /> Rockery-Pete Peters Residence <br /> L&A Job No. 1058 <br /> Fage 5 <br /> content in the fill soil that enable the soil to be compacted to the highest dry density for a given <br /> compaction effort. The sloping face of the fill embankment s6ould be no steeper than 1 H:1 V, and <br /> should be thoroughly compacted to a non-yielding state with a hoe-pack. The toe of the fill <br /> embankment should be set back at least 20 inches belund the heel of the facial stones. The sloping <br /> face of the fill embankment should be lined with a layer of non-woven filter fabric. T"e space <br /> between the facial stones and the cut bank or the fill embankment should be filled with a drain <br /> rock course consisting of 2-to-4-inch rock spalls after each course of the facial stones aze <br /> completed, except that the top 12 inches may consist of compacted on-site soils. <br /> A drain pipe should be laid alcng the low point in the keyway trench behind the base course <br /> stones to collect and drain away groundwater flowing to;vazd the rockery. The drain pip�should <br /> :.onsist of a 4-inch-minimum, perforated, rigid, PVC pipe wrapped in a layer of non-woven filter <br /> fabric. The trench and the drain line should have a slope of at least one percent to generate 1ow <br /> by gravity, and should be tightlined to drain into a storm sewer system. <br /> CLOSURE <br /> We aze pleased to be of service to you on this project. Please fee]free to call us ifyou have any <br /> questions regazding tlus repo�or need further consultation. <br /> 13 G S, <br /> ,�Q,�O�w� L!G Yours very trulY, <br /> �w �•. �� I,N&ASSOCIATES, INC. <br /> f'J , ° � /�J�.�-� <br /> 27589 <br /> � R�� • 7. S.(Ju an)Liu, Ph.D., P.E. <br /> � �S�p�,�Ay� Consulting Geotechnical Engineer <br /> Ex►�nec 7117/ Do <br /> Two plates attached <br /> LIU&ASSOCIATES,INC, <br /> 5�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.