Laserfiche WebLink
( <br /> 12°Gor1 PAGtG� S���H��� Z%2 H :�V <br /> OtJ•SITL 5011. <br /> , , � _ <br /> i � - - <br /> • . . . � .� - <br /> i . , . - _ '� � - <br /> I `' _ ' - , <br /> — • - ," � , <br /> - • - , . . o , � <br /> H �� �Rn.i�J Ro�k i nn� ' u - : .'` �, .' ° � • , �`/� <br /> (�ck �' � o . . '_ . . /�� <br /> GoURSE � • <br /> �Z°'fo4" `o � � `o �. ' ,` . <br /> sP.nws) '.�'. • , � . /• :•' _` .'� <br /> ' . .i — `= - - �• <br /> . �� • ;,` • . � <br /> e� • _ <br /> ;•' �.l. ' STRuctURh.�— <br /> � � - �E .. FII,L <br /> r <br /> ��� _ � i _ SE�1cN�N EXiST• <br /> 12� MI�. L '� � 70 �a �RADE <br /> � _ = r= q — � � , hlo�l-WOVF.rI �Il'(ER FAP�RI G <br /> 20�H��J. 4'�y� MI�•�PERF02ATED, <br /> NCTES: RIGID, PVc �aa��� PIPE <br /> 1. Standa�d Rockery Construction Guidelines published by the Association of the Rockery Contractors should be followed. <br /> 2. Rock material should be hard, sound, durable and free of crecks, fissures and other detects <br /> 3. Emhankment should 6e constructed of structurel fill of clean, free-draining soils,free of organic and other deleteric�us <br /> substances,with particle sizes no larger than 4 inches. Structurel Fill should be placed in liks less than 10 inches ir loose <br /> state and compacted to at least 95%oi the maximum dry density determined by ASTM D1557(Modified Proctor method). <br /> The sioping face of the fill embankment should be compacted to a non-yielding state with a hoe-pack. <br /> next lift of structurel fill. Overlaps oi geogrid mesh in the direction parelleling rockery should be at least 12 inches wide. <br /> 4. The drain pipe should be wrapped in a layer of non-woven filter fabric and completely embedded in pea gravei. The trench <br /> and drain line should have sufficient gradient to generate flow by gravky. <br /> 5. �acial stones should be as nearly rectangula�as possible and stacked tightly against one another with their longest <br /> dimension perdendicular to the face ot rockery and to keep voids no more than 6 inches across in any direction. <br /> 6. The base-course stones should be set on undisturbed,firm, native soil,free of standing water and with an allowable <br /> bearing capacity of at least 3,000 psf. - <br /> 7_ Each tacial stone should be staggered with and firmly supported on two stones below. Facial stones should be tilted back <br /> at a slope no steeper than 6V:1H. � <br /> 8. Drein rock course should consist of 2-to-0-inch quarry spalls, placed in tifts after the completion of each course of facial stones. <br /> ROCK SIZE AND WEIGHT SCHEDULE ROCKERY FACIAL STONE SCHEDULE <br /> Rock Size Weight,Pounds Avg.Dimenslon,Ft. Wall Height Facial Stone Size <br /> ' Smau io large t+.tan 50-200 0.75-1.15 H Ft. Base Course Lower TMrd Middle Thirtl U er Third <br /> Small 10 large P-04an � 200-700 1.25-2.0 4 5 3-Man L lo S 2-Man L lo S 1-Man L lo S^.-Man <br /> . Small to Large 3�Aan 700-2000 2.0-275 6 Lnrge 3�MUn SmaV!3-Man L lo S 3-Men L to S 1-Man <br /> i Smaf lo Large 4�Man 2000-A000 275-3.5 8 Small<-man Lerge 3�Man L lo S 3-Man L to 5 NAan <br /> � S�Man 4000-6000 4.0-�.5 10 Lar�e 17�n Small 4-man Ler e 3-0Aen L to 5 3-Man <br /> � 6Man 8000�8000 q.5-5.0 72 Small 5-01an Large 4-Mnn Sanll 4-man Lar e 3�Man <br /> LIU & ASSCICIATES, INC. TYPICAL SECTION <br /> ROCKERY LINING FILL EMBANKMENT <br /> Geotechnical Engineeriny Engineering Geology�Earth Science PLATE NO. 2 <br /> 7 <br />� <br />