Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: Water Main Replacement P <br /> Contractor: Allied Construction Associates <br /> Work Order No. UP 3598 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> rTh <br /> / # / k2 (0[(C4 <br /> Public.-i.rks Dir o D <br /> Dave Davis <br /> Approved by: <br /> OF/ i( -1 i'lelb <br /> Mayor, of Ev ett Date <br /> Ray St:- n <br /> Attes / .0It <br /> City C erk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: V1 <.L <br /> imity Attorney <br /> il/c//� <br /> Date <br />