My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
425 45TH ST SW 2021-09-14
>
Address Records
>
45TH ST SW
>
425
>
425 45TH ST SW 2021-09-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 8:47:18 AM
Creation date
11/28/2016 3:57:53 PM
Metadata
Fields
Template:
Address Document
Street Name
45TH ST SW
Street Number
425
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DI L EN�i�1��RS, INC. <br />Professional Structural Engineering Services <br />Tom Gish, Port Gardner Pcoperty Management, INC. <br />For: <br />View Ridge Condominiums HOA <br />425 45`�' ST SW <br />Everett, WA 98203 <br />March 19, 2014 <br />DEI Project: 13-311 <br />Re: Letter of Substantial Structural Completion <br />View� Ridge Condominiums-Buildinb 425 <br />Everett, WA 98203 <br />Dear Mr. Gish: <br />Structural <br />Review <br />Summary <br />� � �. <br />�� `� � . <br />� � � <br />Dibble Enginee�s Inc, (DEI} visited the View Ridge Condominiums on March l8, 2014 to obseive the foundation <br />strengthening at the southwest end a»d middle of Building 425. Chi•is Buins, Project Superintendent �vith <br />McBride Construction, met �vith DEI on site and provided access to the bui(ding in addition to information about <br />the construction. Micah Olson, with Advanced Foundation Supports, also met with DEI �n site and provided <br />information on the pile installation. DEI's scope for this project included reviewing the helica] pile ciema��d, <br />visiting the site to observe existing conditions, ai�d providing direction when requested by the project team during <br />COIISlI'UCi1011. <br />DEI's observed the followin� elemen#s on the March 18 visit: <br />IIelical Piles <br />• (50) piles at the continuous spread footings <br />• Piles spaced at 4'-5' on center at the perimeter spread footings <br />• Piles spaced at 30" on center at ttle interior spread footings <br />• (3) piles at an isolated spread footing adjacent to the utility room <br />The helical piles observed appear to be structurally complete and in confor�nance with the observations in Nelson <br />Geoteclmical Associates' report dated March L8, 2014 ancl t}�e recommendations in Structiu•al Design Associates' <br />revised plan dated March 13, 2013. <br />Pin Piles <br />• (4) piles at each of the (4) isolated spread footings at �vest end <br />The pin piles observed appear to be structw-ally complete and in conformance with the observations in Nelson <br />Geotechnical Associates' report dated iv1a�•cl� 18, 2014 and the recommendations Dibble Engineet�s' Structurai <br />Review Swl�mary dated Februaty 24, 2014. <br />1029 �L��rr�ket Str�ect Page 1 of 2�� P. �25-82J'-4200 <br />Kirklafid, Wil 95033 F. =/2 �-827-6131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.