My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
312 75TH ST SE 2017-01-13
>
Address Records
>
75TH ST SE
>
312
>
312 75TH ST SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 7:07:10 AM
Creation date
11/29/2016 9:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
312
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � �� ��� � � � 1 Date: 5/7/2015 <br />�� Public Works Permit #: PW1505-015 <br />City of Everett Public Works Department <br />��� �� 3200 Cedar Street Building Permit #; C1505-007 <br />`�� Everett, WA 98201 Planning Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 125.00 <br />Other $: <br />I OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />LOWE MILO G& MARILYN O <br />312 75TH ST SE <br />EVERETT Wq 98203 <br />PHONE: <br />TAX PARCEL ID # 00393700202303 <br />DESCRIPTION OF PROPOSED WORK: <br />REPLACE FfRE DAMAGED SFR <br />PARADISE CONSTRUCTION INC <br />14751 N. Kelsey St. 331 <br />MONROE Wq <br />PHONE: 4254221999 <br />98272 <br />SITE ADDRESS: 312 75TH ST SE <br />PERMIT CONDITIONS <br />1. Ali calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 � <br />4. Storm water from new impervious surfaces shall not be discharged, through downspouts or other direct pipe';; �m �' <br />connections, into the combined sewer, including a lateral line or side se�h%e� cOnnected��to th'e��i�y's`�om�ined se�v✓er ;-' i <br />._.i _'!"7 '_C'i i.�: i-1 :i::= lJ� 'i=�: :J.i Tt '"Tl -::� 1-]'i •-� i <br />system as per EMC Chapter 14.08.180 H. �:;:;7 �-- :,,_ ��:_ :-r� r� �-rt - �= -` ��� ��-' ---: -�:= <br />��. t'_"� 5= _ ''_:t n'.i _C:. t"t C� F�"J t <br />5. It is the applicant/owner's responsibility to ensure that storm wa�r rurr�F�.;f�p�;�ew i:�pervio�rs_��P���s will �ie <br />mana�ed on-site in a manner that does not adversely affect neighborin j�r'bp�rti�, including the;�ity's Right-o��vay <br />and improvements located therein. �� � <br />6. Th� owner/contractor must contact the City of Everett Inspector R�dy Allen 425-339-7403 prior to starting �-;' <br />construction. ��`6 � � <br />,,; ,, <br />Erosion control $50.00 ,�, ��:. <br />�� . <br />Land/lot machine clearing $35.00 a_ i�� ___ ,....-� �__. .�;� <br />,_: <br />'..I_! � L.F 'G:Y �-Y'�-.t 1:?7 'i�s`.� L:1 r.Y' I�` 'ly -� � <br />r�.� r•,�.� c_,.1 ^� ,:� � ,,-�. , � �;;t �. _ r.. �._, .�:• ,,,..i <br />PW Plan review $20.00 ; �; � _, ::_, , Y; :. : �_, ::: ,�-. _r_:�, �=� �r>, ;._., -.�, <br />�..=Y.' :: L � ��� _ _ � <br />PW Site inspection $20.00 �; be,�'�. _. .� -° ��� �:_ � _ � _� �-•a ; <br />= a —� �� . i� i•..� <br />_ `:>> � > r_:'t �'::� • -ic:. � _o �-� C,r..� ,_:� <br />r � r: <br />--t �>J <br />�:� <br />,-i-•. <br />i--° -�=' <br />d for Co <br />FINAL INSPECTION <br />Approved as Constructed <br />�/ 3 <br />Date <br />/ <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remoye same upon notice from the City and fo replace <br />public pr perty damaged thereby. <br />�� -_ <br />��— r_ <br />;' .� ���- — <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED f3Y THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.